Jun 18

Space Rocket History #68 – Gemini VI & VII with Wally Schirra, Tom Stafford, Frank Borman, and Jim Lovell – Rendezvous – Part 4

The Gemini Program was conceived after it became evident to NASA officials that an intermediate step was required between Project Mercury and the Apollo Program. The major objectives assigned to Gemini were:
1-To subject two men and supporting equipment to long duration flights — a requirement for projected later trips to the moon or deeper space.
2-To effect rendezvous and docking with other orbiting vehicles, and to maneuver the docked vehicles in space, using the propulsion system of the target vehicle for such maneuvers.
3-To perfect methods of reentry and landing the spacecraft at a pre-selected land-landing point.
4-To gain additional information concerning the effects of weightlessness on crew members and to record the physiological reactions of crew members during long duration flights.

By Dave.

By Dave.

Helicopter over G6

Helicopter over G6

G6 on USS Wasp

G6 on USS Wasp

G7 Before Splashdown

G7 Before Splashdown

G7 in the Water

G7 in the Water

G7 Crew on Wasp

G7 Crew on Wasp

G7 Crew on Wasp

G7 Crew on Wasp

Welcome Ceremony

Welcome Ceremony

G6 & 7 on Wasp

G6 & 7 on Wasp

Jun 12

Space Rocket History #67 – Gemini VI & VII with Wally Schirra, Tom Stafford, Frank Borman, and Jim Lovell – Rendezvous – Part 3

From the previous episode, we have Gemini VII waiting in orbit for Gemini VI-A to launch and rendezvous.  Remember, Gemini VII could only remain in orbit for 14 days, the maximum duration of its flight.  The goal was to launch Gemini VI-A on or before day 9 of Gemini VII’s mission.

Stafford in G6-A

Stafford in G6A

GT-6A Abort

GT-6A Abort

By Dave

By Dave

GT-6A Launch

GT-6A Launch

G7 viewed from G6A

G7 viewed from G6A

G7 Viewed from G6A

G7 Viewed from G6A

Jun 05

Space Rocket History #66 – Gemini VI & VII with Wally Schirra, Tom Stafford, Frank Borman, and Jim Lovell – Rendezvous – Part 2

From the previous episode, it was decided that the name of Gemini VI would be changed to Gemini VI-a to distinguish it from the originally planned mission whose objective was to rendezvous with the Agena target vehicle. Gemini VII would be launched first before Gemini VI-a and it would be considered the target vehicle effectively replacing the Agena. After Gemini VII lifted off, Gemini VI-a would be transferred to the launch pad and prepared to launch as soon as possible. After Gemini VI-a rendezvoused with Gemini VII, it would return to earth before Gemini VII.

Lovell & Borman

Lovell & Borman

New Suits

New Suits

Boarding

Boarding

GT-7 Launch

GT-7 Launch

The Moon over Earth

G7-Moon over Earth

Mission Patch

Mission Patch

May 29

Space Rocket History #65 – Gemini VI & VII with Wally Schirra, Tom Stafford, Frank Borman, and Jim Lovell – Rendezvous – Part 1

“We have had a conversation with the Carnarvon tracking station and their report keeps coming back – No joy – No joy.”  NASA Public Affairs Officer Paul Haney.

Gemini Agena

Gemini Agena

Gemini Agena

Gemini Agena

Gemini Agena

Gemini & Agena

Atlas-Agena Launch

Atlas-Agena Launch

Stafford & Schirra

Stafford & Schirra

Mission Patch

Mission Patch

May 22

Space Rocket History #64 – Gemini V with Gordon Cooper and Pete Conrad – 8 Days or Bust -Part 2

This was Flight Director Chris Kraft’s first major problem at the new Mission Control Center in Houston.  He knew the spacecraft had enough battery power for reentry even if the fuel cells failed completely, but he needed to know if there would be time enough to reach a good reentry zone, such as the mid-Pacific near Hawaii on the sixth orbit…

Cape Kennedy

Cape Kennedy

Baja

Baja

Fuel Cells

Fuel Cells

Recovery of GT-5

Recovery of GT-5

Gordo

Gordo

USS Champlain

USS Champlain

May 15

Space Rocket History #63 – Gemini V with Gordon Cooper and Pete Conrad – 8 Days or Bust -Part 1

By this time the Astronauts were thinking about a nickname for their spacecraft, but NASA Headquarters now officially refused to allow nicknames for Gemini spacecraft. However, Gordo Cooper was not so easily put off. Pete Conrad’s father-in-law had whittled a model covered wagon, which inspired Cooper with the idea for a crew patch, that would depict a covered wagon, emblazoned with the legend “Eight Days or Bust.” A personal appeal to NASA Administrator Webb led, after much discussion, to approval of the “Cooper patch.” But Webb greatly disliked the motto because he believed if the mission did not go the full eight days, people would say it had “busted.”

Cockpit Pre-launch

Cockpit Pre-launch

Pete and Gordo

Pete and Gordo

The Patch

The Patch

Launch

Launch

Radar Pod

Radar Pod

By Dave

By Dave

May 08

Space Rocket History #62 – Gemini IV with James McDivitt and Edward White – The Duration – Part 3

On orbit 48, after 75 hours of flight a problem arose. During a pass over the continental US the flight computer was updated. McDivitt was told to switch off the computer. He flipped the switch but the computer did not turn off. On the ground at mission control, efforts to solve the problem began immediately. For the next few orbits, the crew received instructions for trying different switch positions, after all the switching the computer finally failed entirely and could not be turned back on. Now the astronauts would have to resort to a rolling Mercury-type reentry, rather than the lifting bank angle the computer was supposed to help them achieve…

Space Food

Space Food

Water Gun, Scissors

Water Gun, Scissors

After Splashdown

After Splashdown

Boarding the Wasp

Boarding the Wasp

G4 On Display

G4 On Display

Mission Button

Mission Button

May 01

Space Rocket History #61 – Gemini IV with James McDivitt and Edward White – America’s First Spacewalk – Part 2

For the first time Television coverage of the launch had an international audience, as the scene was broadcast to 12 European nations via Intelsat 1 aka the Early Bird satellite of episode 59. Heightened by the prospect of an EVA and the first use of the new Mission Control Center in Houston, interest in Gemini IV reached levels never again matched in the Gemini program…

GT-IV Launch

GT-IV Launch

Zip Gun

Zip Gun

Ed White

Ed White

Ed White

Ed White

By Dave

By Dave