Jun 02

Space Rocket History #163 – Apollo 8 – Lovell, Logistics & Training

The successful Apollo 7 flight cleared the way for a US moon landing in 1969.  Still a lot of flight and ground testing remained and there would probably be surprises.  The greatest concern was Nasa had to complete three virtually flawless missions and achieve every major test objective before a lunar landing could be attempted. The odds seemed to be stack against NASA.

Apollo 8 Crew

Apollo 8 Crew

Jim Lovell (Shaky)

Jim Lovell (Shaky)

The Lovell family watch launch of Apollo 8

The Lovell family watch launch of Apollo 8

Sep 18

Space Rocket History #80 – Gemini X with John Young and Mike Collins – Part 1

Deputy Administrator Seamans wanted a mission review board created to study:
(1) Corrective measures for the Atlas-Agena failure
(2) The guidance update problem that delayed the launch two days
(3) The shroud incident
(4) The suit environmental control difficulties

Gemini X Crew

Gemini X Crew-Collins & Young

Gemini IX to X Handoff

Gemini IX to X Handoff

Mike Collins Suiting Up for Launch

Mike Collins Pre-Launch

Atlas-Agena Prep.

Atlas-Agena Prep.

G10 Atlas-Agena Launch

Gemini X Atlas-Agena Launch

Sep 04

Space Rocket History #78 – Gemini IX-A with Tom Stafford and Gene Cernan – Part 2 – Rendevouz

As contractors worried about technical problems with the Atlas, Once again NASA, faced the necessity for a quick recovery plan when a target vehicle failed to reach orbit. You may recall the first time was with Gemini 6.  But this time Nasa had something in the hangar, an alternate vehicle – the Augment Target Docking Adapter also known as the  ATDA…

Angry Alligator

Angry Alligator

Stafford in Orbit

Stafford in Orbit

ATDA

ATDA

Aug 28

Space Rocket History #77 – Gemini IX-A with Tom Stafford and Gene Cernan – Part 1

After the untimely deaths of Elliot See and Charles Basset, NASA assigned the Gemini IX prime crew positions to Tom Stafford and Gene Cernan.  This was the first time in NASA’s manned space flight history that a backup crew had taken over a mission.  The capsule was renamed Gemini IX-A…

G9-A Patch

G9-A Patch

Agena Launch

Agena Launch

Crew of G9-A, Tom Stafford & Gene Cerenan

Crew of G9-A, Tom Stafford & Gene Cerenan

Aug 21

Space Rocket History #76 – Tragic Prelude to Gemini IX with Elliot See, Charles Bassett, Tom Stafford, and Gene Cernan

In October 1965, Elliot M. See and Charles A. Bassett II were selected to fly Gemini IX. Chief Astronaut Deke Slayton also told them that their backups would be Thomas Stafford and Eugene Cernan.  At that time Stafford was copilot for Gemini VI…

Elliot See

Elliot See

Charles Bassett

Charles Bassett

Gemini IX Crew

Gemini IX Crew

May 15

Space Rocket History #63 – Gemini V with Gordon Cooper and Pete Conrad – 8 Days or Bust -Part 1

By this time the Astronauts were thinking about a nickname for their spacecraft, but NASA Headquarters now officially refused to allow nicknames for Gemini spacecraft. However, Gordo Cooper was not so easily put off. Pete Conrad’s father-in-law had whittled a model covered wagon, which inspired Cooper with the idea for a crew patch, that would depict a covered wagon, emblazoned with the legend “Eight Days or Bust.” A personal appeal to NASA Administrator Webb led, after much discussion, to approval of the “Cooper patch.” But Webb greatly disliked the motto because he believed if the mission did not go the full eight days, people would say it had “busted.”

Cockpit Pre-launch

Cockpit Pre-launch

Pete and Gordo

Pete and Gordo

The Patch

The Patch

Launch

Launch

Radar Pod

Radar Pod

By Dave

By Dave