Jul 06

Space Rocket History #167 – Apollo 8 – Coasting Up Hill and Waste Management

Just a few minutes after Apollo 8’s second TV broadcast, Borman, Lovell, and Anders passed Earth’s  gravitational hill top and crossed into the Moon’s gravitational sphere of influence.

Apollo 8 leaving the spent third stage

Apollo 8 leaving the spent third stage

Apollo 8 Translunar Coast leaving Earth

Apollo 8 Translunar Coast leaving Earth

Apollo 8 mission patch

Apollo 8 mission patch

Jun 22

Space Rocket History #166 – Apollo 8 – Translunar Injection

At T plus 40 seconds Apollo 8 went supersonic and the ride smoothed out. Now it was quite again, but Borman kept a watchful eye on the trajectory readouts. If there was a Saturn malfunction he could whisk the capsule away just by twisting the abort handle. This would trigger the escape rocket.

Apollo 8 Lunar Plan

Apollo 8 Lunar Plan

Apollo 8 Staging

Apollo 8 Staging

View from Apollo 8 in Earth orbit

View from Apollo 8 in Earth orbit

Jun 15

Space Rocket History #165 – Apollo 8 – The Launch

Until now the astronauts knew, in the back of their minds, there was a possibility that a malfunction would turn this countdown into just another practice run and they would have to get out and try again another day. But, as the count reached T minus 15 minutes, there was no doubt, they were really going.

Command Module Main Control Panel

Command Module Main Control Panel

Launch of Apollo 8 with Crescent Moon

Launch of Apollo 8 with Crescent Moon

Apollo 8 Clears the Tower

Apollo 8 Clears the Tower

Jun 08

Space Rocket History #164 – Apollo 8 – Pre-launch

For now the mighty Saturn V stood empty.  But overnight, even while Borman’s crew slept, technicians would ready it for departure.  By morning its enormous fuel thanks would be filled with cryogenic propellants, until the rocket would contain the explosive energy of an atomic bomb.

Lunar mission profile

Lunar mission profile

Apollo 8 crew on the way to the pad 39A

Apollo 8 crew on the way to the pad 39A

Aerial view of Apollo 8

Aerial view of Apollo 8

Feb 25

Space Rocket History #150 – Apollo 6: Pogo and the Tang Ceremony

The success of Apollo 4 gave good reason to believe that the Saturn V could be trusted to propel men into space. But NASA pushed on with its plans for a second unmanned booster flight, primarily to give the Pad 39 launch team another rehearsal before sending men into deep space on the Saturn V.  The mission was called Apollo 6…

Apollo 6 patch

Apollo 6 patch

Lunar Test Article

Lunar Test Article

Apollo 6 launch

Apollo 6 launch

Exhaust plume of Apollo 6

Exhaust plume of Apollo 6

Interstage falling away

Interstage falling away

Apollo 6 splashdown and recovery

Apollo 6 splashdown and recovery

May 21

Space Rocket History #114 – Apollo: Command Module Design and Development 1963-1964 Part 2

Max Faget’s position was that considering the difficulty of the job,  if each mission was successful half the time, it would be well worth the effort.  But Gilruth thought that was too low.  He want a 90% mission success ratio and a 99% ratio for Astronaut safety.  Walt Williams who was currently running the Mercury program believed that astronaut safety needed to be limited to only 1 failure in a million which was 99.9999%.

Launch Escape Vehicle Configuration

Launch Escape Vehicle Configuration

Jettison of the Launch Escape System after a Successful Launch

Jettison of the Launch Escape System after a Successful Launch

Full-Scale Mockup of the Service Module with Panels Off

Full-Scale Mockup of the Service Module with Panels Off

The CM Probe Slips into the LM's Dish-shaped Drogue, and 12 latches on the Docking Ring Engage, to Lock the Spacecraft Together, Airtight

The CM Probe Slips into the LM’s Dish-shaped Drogue, and 12 latches on the Docking Ring Engage

The Cabin Section of the Command Module being Assembled at North American Aviation

The Cabin Section of the Command Module being Assembled at North American Aviation

Command Module Elbow & Shoulder Clearance Problem

Command Module Elbow & Shoulder Clearance Problem

May 14

Space Rocket History #113 – Apollo: Command Module Design and Development 1963-1964

…From the information they gathered on the existing technical problems, Disher and Tischler concluded that prospects were only one in ten that Apollo would land on the moon before the end of the decade….

The "big dish" at Canberra Australia

The “big dish” at Canberra Australia

11/16/63 Blkhouse 37, NASA new Manned Space Flight chief George Mueller briefed. JFK there 6 days before his death

11/16/63 Blkhouse 37, NASA new Manned Space Flight chief George Mueller briefed. JFK there 6 days before his death

Removing LM from S=IVB stage

Removing LM from S=IVB stage

May 07

Space Rocket History #112 – Apollo: Headquarters

“The contractor role in Houston was not very firm. Frankly, they didn’t want us. There were two things against us down there. Number one, it was a Headquarters contract, and it was decreed that the Space Centers shall use GE for certain things; and number two they considered us (meaning GE) to be  Headquarters spies.”  Edward S. Miller of General Electric.

GE Employees Monitor Activities of a Spacecraft Test

GE Employees Monitor Activities of a Spacecraft Test

Comparison of Spacecraft and Launch Vehicles Configurations

Comparison of Spacecraft and Launch Vehicles Configurations

Apollo Tracking Network

Apollo Tracking Network