Nov 16

Space Rocket History #185 – Apollo 10 – Preparations

Although the contractors had shipped excellent spacecrafts, preparations at Kennedy did not go quickly from the assembly building to the launch pad. Testing was delayed several days in order to stay out of the way of Apollo 9 pre-flight activities. Also during maintenance to the Launch Control Center, the electrical power was switched off to replace a valve. The Apollo 10 launch vehicle’s pneumatic controls sensed the power outage, opened some valves and dumped 20,000 liters of fuel on the launch pad.

Apollo 10 logo

Apollo 10 logo

Apollo 10 roll out

Apollo 10 roll out

Apollo 10 and crew

Apollo 10 and crew

Nov 09

Space Rocket History #184 – Apollo 9 – The Return

Even before crawling back into the command module, McDivitt said he was tired and ready for a three-day holiday.  Another 140 hours would pass before touchdown in the Atlantic, but the crew had achieved more than 90 percent of the mission objectives.

Rusty Schweickart's Practice Suit for Apollo 9. Pic taken at Wallops

Rusty Schweickart’s Practice Suit for Apollo 9. Pic taken at Wallops

Apollo 9 approaches splashdown

Apollo 9 approaches splashdown

Apollo 9 crew onboard USS Guadalcanal

Apollo 9 crew onboard USS Guadalcanal

Nov 02

Space Rocket History #183 – Apollo 9 – Lunar Module Maneuvers Part 4

When Scott tried to release the lunar module, he did not hold the button long enough so the lander got hung on the capture latches.

LM in lunar landing configuration. Photographed from CM

LM in lunar landing configuration. Photographed from CM

McDivitt & Schweickart show Spider's landing gear to Scott before they pull away

McDivitt & Schweickart show Spider’s landing gear to Scott before they pull away

LM ascent stage photographed from the CM

LM ascent stage photographed from the CM

Oct 26

Space Rocket History #182 – Apollo 9 – Lunar Module Maneuvers Part 3

On the fourth day of the flight of Apollo 9, Schweickart felt better than expected as he worked his way into the lander to get it ready for the EVA. By the time he had put on the backpack, McDivitt was ready to let him do more – to stand on the lunar lander porch at least.

Lunar Module to Command Module transfer procedure

Lunar Module to Command Module transfer procedure

Schweickart on the porch of the Lunar Module

Schweickart on the porch of the Lunar Module

Scott standing in the open hatch of the Command Module

Scott standing in the open hatch of the Command Module

Oct 19

Space Rocket History #181 – Apollo 9 – Lunar Module Maneuvers Part 2

McDivitt later said that the engine had come on abruptly, but with the tremendous mass, acceleration was very slow – it took the whole 5 seconds to add 11 meters per second to the speed.

Example of the CM's docking probe being removed from the inside to allow access to the LM through the tunnel

Example of the CM’s docking probe being removed from the inside to allow access to the LM through the tunnel

Probe and drogue operations

Probe and drogue operations

Schweickart and McDivitt inside the LM

Schweickart and McDivitt inside the LM

Feb 25

Space Rocket History #150 – Apollo 6: Pogo and the Tang Ceremony

The success of Apollo 4 gave good reason to believe that the Saturn V could be trusted to propel men into space. But NASA pushed on with its plans for a second unmanned booster flight, primarily to give the Pad 39 launch team another rehearsal before sending men into deep space on the Saturn V.  The mission was called Apollo 6…

Apollo 6 patch

Apollo 6 patch

Lunar Test Article

Lunar Test Article

Apollo 6 launch

Apollo 6 launch

Exhaust plume of Apollo 6

Exhaust plume of Apollo 6

Interstage falling away

Interstage falling away

Apollo 6 splashdown and recovery

Apollo 6 splashdown and recovery

Feb 18

Space Rocket History #149 – Apollo 5: Lunar Module’s First Flight

“The fire-in-the-hole abort was the most critical test of the mission and one we had to accomplish successfully prior to a manned mission.” Gene Kranz – Flight Director Apollo 5

Apollo 5 Mission Patch

Apollo 5 Mission Patch

Lunar Module 1 delivered to the Cape

Lunar Module 1 delivered to the Cape

LM 1 mated to the spacecraft lunar module adapter

LM 1 mated to the spacecraft lunar module adapter

LM 1 inside adapter being hoisted to the booster

LM 1 inside adapter being hoisted to the booster

Apollo 5 on the launch pad

Apollo 5 on the launch pad

Apollo 5 lift off

Apollo 5 lift off

Feb 11

Space Rocket History #148 – Apollo 4: Operation Big Shot

“…our building’s shaking here. Our building’s shaking! Oh it’s terrific, the building’s shaking! This big blast window is shaking! We’re holding it with our hands! Look at that rocket go into the clouds at 3000 feet!…you can see it…you can see it…oh the roar is terrific!…”  Walter Cronkite – Apollo 4 launch.

Apollo 4 mating of SC -017 with Saturn 501

Apollo 4 mating of SC -017 with Saturn 501

Apollo 4 on Launch Pad

Apollo 4 on Launch Pad

Apollo 4 the night before the launch

Apollo 4 the night before the launch

Apollo 4 lift off from LC-39A.

Apollo 4 lift off from LC-39A.

Apollo 4 leaves the launch pad

Apollo 4 leaves the launch pad

View of crescent Earth from Apollo 4.

View of crescent Earth from Apollo 4.