May 04

Space Rocket History #159 – Zond 6

Trouble began on the sixth day of the flight, November 17. The capsule developed an atmospheric  leak, the pressure first dropping from 760 to 380 mm of Mercury.  With the drop in cabin pressure all the animal test subjects died.  It would have killed any Cosmonaut not wearing a spacesuit.

Proton-K with 7K-L1

Proton-K with 7K-L1

Zone 6 mission profile

Zone 6 mission profile

Zond 6 Double-dip reentry

Zond 6 Double-dip reentry

Mar 30

Space Rocket History #155 – Apollo 7 – Assembly, Testing, Training, and Launch

Command Service Module-101 started through the manufacturing cycle early in 1966. By July, it had been formed, wired, fitted with subsystems, and made ready for testing. After the Apollo 1 fire in January 1967, changes had to be made, mainly in the wiring, hatch areas, and the forward egress tunnel. It was December before the spacecraft came back into testing. CSM-101 passed through a three-phase customer acceptance review; during the third session, held in Downey on May 7th 1968, no items showed up that might be a “constraint to launch.” North American cleared up what few deficiencies there were (13) and shipped the craft to Kennedy on  May 30th 1967…

AS-205's First Stage on the pedestal

AS-205’s First Stage on the pedestal

Apollo 7 Crew practice climbing out of the spacecraft

Apollo 7 Crew practice climbing out of the spacecraft

Apollo 7 Launch

Apollo 7 Launch

Mar 23

Space Rocket History #154 – Apollo 7 – The Crew

Had it not been for the fact that Eisele damaged his shoulder during a zero-G training flight aboard a KC-135 aircraft just before Christmas 1965, he might have been in the senior pilot’s seat aboard Apollo 1, instead of Ed White.

 Schirra as the Commander of Apollo 7

Schirra as the Commander of Apollo 7

Donn Eisele prior to launch

Donn Eisele prior to launch

Cunningham during the Apollo 7 mission

Cunningham during the Apollo 7 mission

Mar 16

Space Rocket History #153 – Zond 5 – Tortoises in Space & Nasa Stennis

The first attempt for a Zond 4 follow-up launched on April 22.  It failed when the Launch Escape System sent an erroneous abort command at T+260 seconds and shut down the Proton booster’s second stage. The escape rocket fired and pulled the descent module to safety.

Zond 5

Zond 5

Zond 5 Recovery

Zond 5 Recovery Indian Ocean

Scientist observing lunar Tortoises

Scientist observing lunar Tortoises

Feb 25

Space Rocket History #150 – Apollo 6: Pogo and the Tang Ceremony

The success of Apollo 4 gave good reason to believe that the Saturn V could be trusted to propel men into space. But NASA pushed on with its plans for a second unmanned booster flight, primarily to give the Pad 39 launch team another rehearsal before sending men into deep space on the Saturn V.  The mission was called Apollo 6…

Apollo 6 patch

Apollo 6 patch

Lunar Test Article

Lunar Test Article

Apollo 6 launch

Apollo 6 launch

Exhaust plume of Apollo 6

Exhaust plume of Apollo 6

Interstage falling away

Interstage falling away

Apollo 6 splashdown and recovery

Apollo 6 splashdown and recovery

Feb 18

Space Rocket History #149 – Apollo 5: Lunar Module’s First Flight

“The fire-in-the-hole abort was the most critical test of the mission and one we had to accomplish successfully prior to a manned mission.” Gene Kranz – Flight Director Apollo 5

Apollo 5 Mission Patch

Apollo 5 Mission Patch

Lunar Module 1 delivered to the Cape

Lunar Module 1 delivered to the Cape

LM 1 mated to the spacecraft lunar module adapter

LM 1 mated to the spacecraft lunar module adapter

LM 1 inside adapter being hoisted to the booster

LM 1 inside adapter being hoisted to the booster

Apollo 5 on the launch pad

Apollo 5 on the launch pad

Apollo 5 lift off

Apollo 5 lift off

Feb 11

Space Rocket History #148 – Apollo 4: Operation Big Shot

“…our building’s shaking here. Our building’s shaking! Oh it’s terrific, the building’s shaking! This big blast window is shaking! We’re holding it with our hands! Look at that rocket go into the clouds at 3000 feet!…you can see it…you can see it…oh the roar is terrific!…”  Walter Cronkite – Apollo 4 launch.

Apollo 4 mating of SC -017 with Saturn 501

Apollo 4 mating of SC -017 with Saturn 501

Apollo 4 on Launch Pad

Apollo 4 on Launch Pad

Apollo 4 the night before the launch

Apollo 4 the night before the launch

Apollo 4 lift off from LC-39A.

Apollo 4 lift off from LC-39A.

Apollo 4 leaves the launch pad

Apollo 4 leaves the launch pad

View of crescent Earth from Apollo 4.

View of crescent Earth from Apollo 4.

Nov 12

Space Rocket History #137 – Apollo 1: Changes and Recovery

After the uncertain days of February 1967, NASA officials began to realize that a recovery from the tragedy was under way. Through hard work and problem solving, morale of Nasa personnel started to improve…

Remains of Launch Complex 34

Remains of Launch Complex 34

Memorial benches on the edge of launch pad 34

Memorial benches on the edge of launch pad 34

Memorial plaque attached to launch pad 34

Memorial plaque attached to launch pad 34

Memorial plaque attached to launch pad 34

Memorial plaque attached to launch pad 34

Apollo 1 medallion flown on Apollo 9

Apollo 1 medallion flown on Apollo 9