Feb 27

Space Rocket History #52 – Gemini 1 – Test Flight – Part 2

One second after 11 o’clock Wednesday morning, April 8th 1964, the Titan II booster’s first-stage engine ignited. Four seconds later, the 156 ton vehicle lifted from the pad on that curiously lambent flame so distinctive of Titan II’s hypergolic propellants. Within moments, Gemini-Titan 1 vanished into the hot Florida sky, beyond reach of human senses but not electronic sensors. Telemetry data flowed back to mission controllers at the Cape, telling them that the launch was as nearly perfect as it looked.

Gemini 1 Experiment Pallets

Experiment Pallets

Gemini 1 Left Instrument Pallet

Left Instr. Pallet

Gemin 1 Launch

Gemin 1 Launch

Gemini1-1

To the Pad

space rocket history pic69

By Dave

Tang

Celebration Tang

Feb 20

Space Rocket History #51 – Gemini 1 – Test Flight – Part 1

The primary objective of the first Gemini mission, was to prove that the Titan II was capable of launching the Gemini spacecraft into orbit within the tolerances imposed by manned space flight. The secondary objective was for the spacecraft to gather and report data.”

Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21,1964

Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21,1964

Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered

Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered

Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft

Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft