Space Rocket History #112 – Apollo: Headquarters

“The contractor role in Houston was not very firm. Frankly, they didn’t want us. There were two things against us down there. Number one, it was a Headquarters contract, and it was decreed that the Space Centers shall use GE for certain things; and number two they considered us (meaning GE) to be  Headquarters spies.”  Edward S. Miller of General Electric.

GE Employees Monitor Activities of a Spacecraft Test

GE Employees Monitor Activities of a Spacecraft Test

Comparison of Spacecraft and Launch Vehicles Configurations

Comparison of Spacecraft and Launch Vehicles Configurations

Apollo Tracking Network

Apollo Tracking Network

Apr 30

Space Rocket History #111 – Apollo: Early Lunar Module Design and Saturn SA-3”

During 1962, NASA faced three major tasks: first the mode selection and its defense (covered in episodes 106-109), second keeping North American moving on the command and service modules (covered in episode 110) and third finding a contractor to develop the separate landing vehicle required by that approach.  Which we will cover today in episode 111.

One-eighth scale Lunar Module shown by Grumman

One-eighth scale Lunar Module shown by Grumman

Bell Aerospace Lunar Landing Research Vehicle

Bell Aerospace Lunar Landing Research Vehicle

Saturn SA-3 Launch

Saturn SA-3 Launch

Apr 23

Space Rocket History #110 – Early Apollo Command Module Design

The Apollo contract specified a shirt-sleeve environment. For this reason, North American was told not to include in its design a hatch that opened by explosives, like Mercury’s. An accidentally blown hatch in space would cause an instant vacuum and certain death for an astronaunt not wearing his pressure suit.

Major parts of the CM Structure

Major parts of the CM Structure

NAA Apollo Team Storms, Paup, and Feltz

NAA Apollo Team Storms, Paup, and Feltz

Carpenter, Glenn, & Schirra in a full-scale mock up of the CM

Carpenter, Glenn, & Schirra in a full-scale mock up of the CM

The Impact Facility at NAA

The Impact Facility at NAA

Interior of a partial full-scale mockup of CM

Interior of a partial full-scale mockup of CM

Complete Apollo Family

Complete Apollo Family

Mar 18

Space Rocket History #105 – Saturn’s First Flight – SA-1 – Part 2

No previous maiden launch had gone flawlessly, and the Saturn C-1 was considerably more complicated than any rocket launched thus far. Launch Operations Directorate officials gave the rocket a 75% chance of getting off the ground, and a 30% chance of completing the eight-minute flight…

LC-34 Block House Control Room

LC-34 Block House Control Room

Abe Silverstein, Director of Space Flight

Abe Silverstein, Director of Space Flight

Liftoff or Saturn SA-1

All Eight Engines Firing and Liftoff of Saturn SA-1

Saturn SA-1 on Launch Pad 34

Saturn SA-1 on Launch Pad 34

Saturn SA-1 Leaving the Pad

Saturn SA-1 Leaving the Pad

Saturn SA-1  in Flight.

The First Saturn (SA-1) in Flight.

The Michoud Facility near New Orleans

The Michoud Facility near New Orleans

Ground Breaking at MSC

Ground Breaking at MSC