Mar 13

Space Rocket History #54 – Gemini 2 – Part 2

Gemini Launch Vehicle Two’s misfortunes during August and September 1964 forced NASA to forego its goal of a manned Gemini 3 flight before the end of the year, Gemini-Titan 2 was now scheduled for mid-November 1964, and Gemini 3 for the end of January 1965…

View from Gemini 2

View from Gemini 2

Gemini 2

Gemini 2

Gemini 2 Heat Shield

Gemini 2 Heat Shield

Mar 06

Space Rocket History #53 – Gemini 2 – Part 1

The bright outlook that was prevalent in April turned dark in the late summer of 1964 when a series of natural disasters struck the Cape. First lightning, then hurricanes, damaged the Gemini 2 launch vehicle to delay its flight long past the scheduled time.  Even if the weather had been perfect, McDonnell’s difficulties in getting Spacecraft 2 ready to fly might have compromised the schedule on its own…

Mercury vs. Gemini

Mercury vs. Gemini

Retrograde Adapter

Retrograde Adapter

Ejection

Ejection

First Stage of GLV-2

First Stage of GLV-2

Instrumentation Pallets in Astronaut Seats

Instrumentation instead of Astronauts

Gemini 2 Launch

Gemini 2 Launch

Feb 27

Space Rocket History #52 – Gemini 1 – Test Flight – Part 2

One second after 11 o’clock Wednesday morning, April 8th 1964, the Titan II booster’s first-stage engine ignited. Four seconds later, the 156 ton vehicle lifted from the pad on that curiously lambent flame so distinctive of Titan II’s hypergolic propellants. Within moments, Gemini-Titan 1 vanished into the hot Florida sky, beyond reach of human senses but not electronic sensors. Telemetry data flowed back to mission controllers at the Cape, telling them that the launch was as nearly perfect as it looked.

Gemini 1 Experiment Pallets

Experiment Pallets

Gemini 1 Left Instrument Pallet

Left Instr. Pallet

Gemin 1 Launch

Gemin 1 Launch

Gemini1-1

To the Pad

space rocket history pic69

By Dave

Tang

Celebration Tang

Feb 20

Space Rocket History #51 – Gemini 1 – Test Flight – Part 1

The primary objective of the first Gemini mission, was to prove that the Titan II was capable of launching the Gemini spacecraft into orbit within the tolerances imposed by manned space flight. The secondary objective was for the spacecraft to gather and report data.”

Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21,1964

Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21,1964

Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered

Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered

Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft

Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft