Podcast: Play in new window | Download
Subscribe: Email | TuneIn | RSS
Saturn 1, SA-6 was the first orbital launch of an Apollo Spacecraft by a Saturn Launch Vehicle and also the first flight utilizing an active ST-124 Stabilized Platform.
Podcast: Play in new window | Download
Subscribe: Email | TuneIn | RSS
Saturn 1, SA-6 was the first orbital launch of an Apollo Spacecraft by a Saturn Launch Vehicle and also the first flight utilizing an active ST-124 Stabilized Platform.
Podcast: Play in new window | Download
Subscribe: Email | TuneIn | RSS
Max Faget’s position was that considering the difficulty of the job, if each mission was successful half the time, it would be well worth the effort. But Gilruth thought that was too low. He want a 90% mission success ratio and a 99% ratio for Astronaut safety. Walt Williams who was currently running the Mercury program believed that astronaut safety needed to be limited to only 1 failure in a million which was 99.9999%.
Podcast: Play in new window | Download
Subscribe: Email | TuneIn | RSS
…From the information they gathered on the existing technical problems, Disher and Tischler concluded that prospects were only one in ten that Apollo would land on the moon before the end of the decade….
Podcast: Play in new window | Download
Subscribe: Email | TuneIn | RSS
“The contractor role in Houston was not very firm. Frankly, they didn’t want us. There were two things against us down there. Number one, it was a Headquarters contract, and it was decreed that the Space Centers shall use GE for certain things; and number two they considered us (meaning GE) to be Headquarters spies.” Edward S. Miller of General Electric.