Sep 17

Space Rocket History #130 – Apollo 1: Preparation

While flight-preparation crews were having problems, Grissom, White, and Chaffee were finding bottlenecks in training activities. The chief problem was keeping the Apollo mission simulator current with changes being made in spacecraft 012.

Command and Service Modules 012 at North American

Command and Service Modules 012 at North American

Apollo 1 Arrives at the Cape

Apollo 1 Arrives at the Cape

Grissom, Chaffee, & White check the communications headgear

Grissom, Chaffee, & White check the communications headgear

Sep 10

Space Rocket History #129 – Apollo Mission Control: An Introduction to Eugene Frances Kranz

As Procedures Officer, Kranz was put in charge of integrating Mercury Control with the Launch Control Team at Cape Canaveral, Florida, writing the “Go/NoGo” procedures that allowed missions to continue as planned or be aborted, along with serving as a sort of switchboard operator using teletype between the control center at Cape Canaveral and the agency’s fourteen tracking stations and two tracking ships located across the globe.

Kranz & his F86 Saber Cat

Kranz & his F86 Saber Cat

Kranz at his console in 1965

Kranz at his console in 1965

Kranz and his teacher Chris Kraft

Kranz and his teacher Chris Kraft

Sep 03

Space Rocket History #128 – Apollo Mission Control: Christopher Columbus Kraft – Part 2

At the beginning of the Apollo program, Kraft retired as a flight director to concentrate on management and mission planning. In 1972, he became director of the Manned Spacecraft Center, following the path of his mentor Robert Gilruth.

Kraft in Mission Control for Gemini 5

Kraft in Mission Control for Gemini 5

Ad. Abhau, Robert Thompson, and Kraft

Ad. Abhau, Robert Thompson, and Kraft

Kraft with his new flight Directors

Kraft with his new flight Directors

Jul 23

Space Rocket History #122 – Apollo: Serious Problems with the Lunar Module and Grumman

Toward the end of January 1967, it was revealed that Lunar Module 1 would not reach the Cape in February, as expected. This meant, the moon landing might be delayed because the lander was not ready. But the mission planners could not wait for the Apollo engineers to iron out all the problems. They had to plan for a landing in 1969 and hope that the hardware would catch up with them.

Lunar Module Diagram

Lunar Module Diagram

John Disher Explains the Components of the Apollo Program

John Disher Explains Apollo Components

Lunar Module Test Article LTA-2R

Lunar Module Test Article LTA-2R