Apr 24

Space Rocket History #60 – Gemini IV with James McDivitt and Edward White – Part 1

The success of Gus Grissom and John Young’s Gemini 3 flight paved the way for long duration space missions. The longest U.S. manned space flight to date was Gordon Cooper’s 34 hour Mercury flight. The Soviets, however, had four long duration flights to their credit, ranging from 70 to 119 hours. It was time for the US to attempt a long duration flight.

James A. McDivitt

James A. McDivitt

Edward White II

Edward White II

Gemini 4 Astronauts

Gemini 4 Crew

Apr 10

Space Rocket History #58 – Corned Beef Controversy – Gemini 3 with Gus Grissom and John Young – Part 2

Grissom – What is it?
Young: Corned beef sandwich.
Grissom: Where did it come from?
Young: I brought it with me. Let’s see how it tastes. Smells, doesn’t it.
Grissom: Yes, its breaking up. I’m going to stick it in my pocket.
Young: Is it? It was a thought, anyway.
Grissom: Yep.
Young: Not a very good one.
Grissom: Pretty good, thought, if it would just hold together.
Young: Want some chicken leg?
Grissom: No you can handle that.

Launch of GLV-3

Launch of GLV-3

Staging

Staging

View from G3

View from G3

Recovery

Recovery

Carrier Recovery

Carrier Recovery

By Dave.

By Dave.

Apr 03

Space Rocket History #57 – First Gemini Manned Mission – Gemini 3 with Gus Grissom and John Young

The precise scope of the Gemini 3 mission remained uncertain until very nearly the eve of flight. In April of 1963, the GT-3 mission directive was “to demonstrate and evaluate the capabilities of the spacecraft and launch vehicle system, and the procedures necessary for the support of future long-duration and rendezvous missions.”  But, that was a broad scope and did not clearly specified how GT-3 would accomplish it objective…

Mission Patch

Mission Patch

Young - Grissom

Young – Grissom

Water Training

Water Training

Young & Grissom

Young & Grissom

John Young

John Young

Control Panel

Control Panel

Feb 20

Space Rocket History #51 – Gemini 1 – Test Flight – Part 1

The primary objective of the first Gemini mission, was to prove that the Titan II was capable of launching the Gemini spacecraft into orbit within the tolerances imposed by manned space flight. The secondary objective was for the spacecraft to gather and report data.”

Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21,1964

Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21,1964

Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered

Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered

Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft

Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft