Jan 08

Space Rocket History #95 – Soyuz Development – Part 4 – Politics and Testing

“In those days, the Party organizations in industry were not only involved with policy, ideology, and the “struggle against nonconformist thought,” but tried to get involved in technology and production engineering. Wielding real authority over people who were Party members, they had the opportunity to affect the production process. With few exceptions, every chief designer was a Party member. It was far more dangerous to receive a Party reprimand than a reprimand ordered by the head of an enterprise or even a minister.

The Communist Party of the Soviet Union was a party of power. This was a party that actively meddled in the production process not only from the top—through the Central Committee or Politburo—but also from the bottom. Things did not always turn out as planned, but as a rule, they had the best of intentions. The Party attempted to encompass all aspects of a person’s life with its ideological influence. Any job was supposed to be a “thing of virtue, honor, and heroism,” not for the sake of personal prosperity, but to strengthen the power of the state. “So long as our motherland lives, there are no other cares”—these words succinctly and rather accurately reflected the spirit of a myriad of Party propaganda campaigns. Any deviation from the Party line was punished mercilessly. The Party allowed no liberalism within its ranks.“ Boris Chertok.

Soyuz 7k-Ok Assembly

Soyuz 7k-Ok Assembly

Docking Simulators

Docking Simulators

Soyuz Panel

Soyuz Panel

Jan 01

Space Rocket History #94 – Soyuz Development – Part 3

After Voskhod-2, an ideological vacuum, disorder, and vacillation cropped up in the Soviet maned space program. There was no clear-cut answer to which project should be the priority, a new series of Voskhods, artificial gravity experiments, or the construction of the Soyuzes.  However, during  August 1965 the wavering ended.  First priority was given to the Soyuzes.  A real all-hands rush job to develop and manufacture Soyuzes got underway. A new un-realistic schedule was created that required OKB-1 to supply, three Soyuz flight vehicles ready for testing, two in December of 1965 and one in January of 1966.

Shuttle vs. Soyuz Size

Shuttle vs. Soyuz Size

Igla Docking System

Igla Docking System

Proton K

Proton K

Dec 18

Space Rocket History #93 – Soyuz Development – Part 2 – Rivals

The circumlunar plan involved 3 new spacecrafts. First the Soyuz A 7K spacecraft, capable of carrying three men, (2 men for a circumlunar flight) into space and returning them to earth. The 5.5 ton spacecraft has three modules, the orbital module, the re-entry module, and the service module.

The second new spacecraft is the Soyuz B 9K booster stage, with a fueled mass of 18 tons. After docking with the 7K, the 9K is capable of boosting the combined spacecraft out of earth orbit on a course to the moon.

The third new space craft is called Soyuz V 11k tanker. It has a mass of 5 tons. It is used to ferry fuel from the earth to the 9K Booster. It will take 4 tankers to fill the 9K booster with enough fuel to push the Soyuz 7K on a path to the moon.

Soyuz A, B, V

Soyuz A, B, V

Vladimir Chelomey

Vladimir Chelomey

Boris Chertok

Boris Chertok

Soyuz 7K-OK

Soyuz 7K-OK

Dec 11

Space Rocket History #92 – Soyuz Development – Part 1

Hey everyone. I have been sick for a week and unable to talk, without coughing up a lung.  But, I didn’t want you to miss your weekly dose of Space Rocket History.  My wife agreed to help me out with the vocal part of this episode.  This is her first podcast so please be nice to her.  Hopefully, I will be able to speak a complete sentence without coughing my head off next week.

I want to thank my wife, Caroline Annis  from the bottom of my heart for her help with this episode.

Soyuz Diagram

Soyuz Diagram

Soyus A

Soyus A

Soyuz A

Soyuz A

 

By Dave

By Dave