Space Rocket History Logo
Space Rocket History Podcast Welcome to the Space Rocket History podcast

Episodes Tagged with "Apollo 6"

Posted on February 11, 2016

“…our building’s shaking here. Our building’s shaking! Oh it’s terrific, the building’s shaking! This big blast window is shaking! We’re holding it with our hands! Look at that rocket go into the clouds at 3000 feet!…you can see it…you can see it…oh ...

6-A crescent Earth, as photographed from Apollo 4

5-apollo4_launch

4-Apollo 4 unmanned mission lifts off from launch pad 39A at the Kennedy Space Center

3-Apollo_4_on_the_night_before_launch,_Kennedy_Space_Center,_Florida,_1967

2-Apollo 4 on launch pad 39

1-apollo 4 mating

Posted on February 18, 2016

“The fire-in-the-hole abort was the most critical test of the mission and one we had to accomplish successfully prior to a manned mission.” Gene Kranz – Flight Director Apollo 5

6-Apollo5 Launch

5-Apollo_5_on_pad with Saturn 1B

4-Lem inside adapter hoisted

3-Lunar Module 1 being mated to the Spacecraft Lunar Module Adapter in preparation for launch as Apollo 5

2-LM1Delivered to the Cape

1-Apollo 5 Mission Patch

Posted on February 25, 2016

The success of Apollo 4 gave good reason to believe that the Saturn V could be trusted to propel men into space. But NASA pushed on with its plans for a second unmanned booster flight, primarily to give the Pad 39 launch team another rehearsal before...

5-Apollo-6-1968-04-04

4-Apollo 6’s interstage falling away

3-Apollo6fireyExhaustPlume

2-Apollo_6_launch

1-The Lunar Module Test Article (LTA-2R) is being moved for mating with the spacecraft Lunar Module Adapter

0-apollo-6-final_0

Posted on March 23, 2016

Had it not been for the fact that Eisele damaged his shoulder during a zero-G training flight aboard a KC-135 aircraft just before Christmas 1965, he might have been in the senior pilot’s seat aboard Apollo 1, instead of Ed White.

3-Cunningham during the Apollo 7 mission

2-Donn_F._Eisele prior to launch of ap17

1- Schirra as the Commander of Apollo 7 crew

Posted on March 30, 2016

Command Service Module-101 started through the manufacturing cycle early in 1966. By July, it had been formed, wired, fitted with subsystems, and made ready for testing. After the Apollo 1 fire in January 1967, changes had to be made, mainly in the w...

3-Apollo 7 Launch

2-Schirra, Eisele, and Cunningham (left to right) practice climbing out of the spacecraft into a life raft, to perfect recovery procedures

1-Saturn 205’s first stage rests on the pedestal at Launch Complex 34 before mating with other stages for launch

Posted on May 12, 2016

An ‘A’ type mission would be flown with a Saturn V and be used to test the Launch vehicle, spacecraft, and a high velocity lunar return. Nasa cover the ‘A’ mission with Apollo 4 & 6. A ‘B’ type mission would be flow with a Saturn IB and test the lun...

OwenMaynardStepstotheMoon

chief of the LEM engineering office in the Apollo Program Office in Houston, TexasJPG

3-GeorgeLow

Posted on May 19, 2016