Space Rocket History Logo
Space Rocket History Podcast Welcome to the Space Rocket History podcast

Episodes Tagged with "Eberhard Rees"

Posted on February 4, 2016

“The S-II stage was a nightmare the minute it was conceived, and it only got worse from there. During the course of its creation, it would grind up people and careers the way the transcontinental railway devoured laborers.  Though the methods and mat...

5-Test firing of a Saturn V second stage rocket S-II

6-s-ii-subassemblies

4-S-II_Inboard_1963

3-The S-II stage during stacking operations of Apollo 6 in the VAB

2-S-2 assembly building in Seal Beach, CA

1=7s-ii-cut-away-w-callouts

1=6s-ii-subassemblies-sm

1-Saturn_V_second_stage

Posted on February 25, 2016

The success of Apollo 4 gave good reason to believe that the Saturn V could be trusted to propel men into space. But NASA pushed on with its plans for a second unmanned booster flight, primarily to give the Pad 39 launch team another rehearsal before...

5-Apollo-6-1968-04-04

4-Apollo 6’s interstage falling away

3-Apollo6fireyExhaustPlume

2-Apollo_6_launch

1-The Lunar Module Test Article (LTA-2R) is being moved for mating with the spacecraft Lunar Module Adapter

0-apollo-6-final_0

Posted on May 12, 2016

An ‘A’ type mission would be flown with a Saturn V and be used to test the Launch vehicle, spacecraft, and a high velocity lunar return. Nasa cover the ‘A’ mission with Apollo 4 & 6. A ‘B’ type mission would be flow with a Saturn IB and test the lun...

OwenMaynardStepstotheMoon

chief of the LEM engineering office in the Apollo Program Office in Houston, TexasJPG

3-GeorgeLow