Episodes Tagged with "M 26"
Posted on March 12, 2015
Lifting the first stage from the transporter
Hoisting the stage in vertical attitude
Erecting the upper stages
Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles
16-Unloading Compromise in Florida
15-S-I and S-IV stages aboard the Compromise
14-Booster movement around Wheeler Dam
11-Launch Complex 34
10-Configurations of Saturn flight vehicles
9-Saturn Barge route
7-Six-engine configuration of the S-IV stage
6-Redesigned tail of the Saturn booster
5- The barge Palaemon
3-First horizontal mating of the Saturn vehicle
2-Movement of dummy S-IV stage to checkout
Posted on March 18, 2015
To assemble the large Saturns, NASA needed a plant, preferably one already built. The Michoud facility (above), close to New Orleans, suited the requirements
Saturn_SA1_on_launch_pad
Modules of the Apollo spacecraft were tested in Florida in the Manned Spacecraft Operations Building. Above, NASA officials Walt Williams, Merritt Preston, Kurt Debus, Brainerd Holmes, and Wernher von Braun
Maiden launch of the Apollo program- Saturn SA-1 from Cape Canaveral, 27 October 1961
First Saturn Launch
Liftoff of Saturn I. Note the long cable mast falling away on the right
mySuperLamePic_c001b3d7f61bec278243523bf2e79253
Abe Silverstein, NASA’s Director of Space Flight Development, is shown touring a rocket engine facility
1-Launch Complex 34, blockhouse interior
