Space Rocket History Logo
Space Rocket History Podcast Welcome to the Space Rocket History podcast

Episodes Tagged with "Saturn I"

Posted on March 5, 2015

Many historians agree, the U.S. took its first step toward the moon in the spring of 1957, four years before President Kennedy declared the national goal of landing a man on the Moon, and returning him safely to the Earth. While still preparing for t...

12-Second stage (S-IV)

11-Booster stage (S-I)

10-Proposed C-2

9-C-1 and earlier vehicles

8-Model of blockhouse at Launch Complex 34

7-Vehicles using Titan and Atlas stages

6-Saturn C

5-Saturn B

4-Preliminary concept of Launch Complex 34, Cape Canaveral

3-Early H-1 Engine

2-Thor-Jupiter engine

1-Proposed configuration of a clustered booster

Posted on March 12, 2015

Just as launch complex 34 dwarfed its predecessors, Saturn’s checkout represented a new magnitude in launch operations. The Saturn C-1 stood three times higher, required six times more fuel, and produced ten times more thrust than the Jupiter. Its si...

Lifting the first stage from the transporter

Hoisting the stage in vertical attitude

Erecting the upper stages

Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles

16-Unloading Compromise in Florida

15-S-I and S-IV stages aboard the Compromise

14-Booster movement around Wheeler Dam

11-Launch Complex 34

10-Configurations of Saturn flight vehicles

9-Saturn Barge route

7-Six-engine configuration of the S-IV stage

6-Redesigned tail of the Saturn booster

5- The barge Palaemon

3-First horizontal mating of the Saturn vehicle

2-Movement of dummy S-IV stage to checkout

Posted on March 18, 2015

No previous maiden launch had gone flawlessly, and the Saturn C-1 was considerably more complicated than any rocket launched thus far. Launch Operations Directorate officials gave the rocket a 75% chance of getting off the ground, and a 30% chance of...

To assemble the large Saturns, NASA needed a plant, preferably one already built. The Michoud facility (above), close to New Orleans, suited the requirements

Saturn_SA1_on_launch_pad

Modules of the Apollo spacecraft were tested in Florida in the Manned Spacecraft Operations Building. Above, NASA officials Walt Williams, Merritt Preston, Kurt Debus, Brainerd Holmes, and Wernher von Braun

Maiden launch of the Apollo program- Saturn SA-1 from Cape Canaveral, 27 October 1961

First Saturn Launch

Liftoff of Saturn I. Note the long cable mast falling away on the right

mySuperLamePic_c001b3d7f61bec278243523bf2e79253

Abe Silverstein, NASA’s Director of Space Flight Development, is shown touring a rocket engine facility

1-Launch Complex 34, blockhouse interior

Posted on May 14, 2015

…From the information they gathered on the existing technical problems, Disher and Tischler concluded that prospects were only one in ten that Apollo would land on the moon before the end of the decade….

Full-scale model of the command module, above- the strake aerodynamic devices may be seen at either side of the spacecraft just above the aft heatshield

Removing LM from S=IVB stage

On 16 November 1963 in Cape Canaveral’s Blockhouse 37, NASA’s new manned space flight chief George Mueller

Communications with the moon as the earth turned. Astronauts on the moon’s surface also could talk to one another

Posted on May 21, 2015

Max Faget’s position was that considering the difficulty of the job,  if each mission was successful half the time, it would be well worth the effort.  But Gilruth thought that was too low.  He want a 90% mission success ratio and a 99% ratio for Ast...

download

The cabin section (or primary structure) of the CM is assembled at North American in 1965

The CM probe would slip into the LM’s dish-shaped drogue, and 12 latches on the docking ring would engage, to lock the spacecraft together, airtight

Full-scale model of the service module, resting on a mockup of a spacecraft-lunar module adapter, with panels off to reveal part of the internal arrangement

Jettison of the launch escape system (right) after successful launch, also pulls away the boost protective cover that protects the windows from flame and soot

On the drawing of the launch escape system at upper right, the canard aerodynamic devices are near the top of the escape tower

Posted on May 28, 2015

Saturn 1, SA-6 was the first orbital launch of an Apollo Spacecraft by a Saturn Launch Vehicle and also the first flight utilizing an active ST-124 Stabilized Platform.

VonBraunMuellerReesSA6

SA5_launch

sa-6-spacecraft

sa-6-dem

SA-6 spacecraft and launch vehicle ready to go

SA-6 on pad

SA-5Section cuts

SA-5

SA-5 S-IV stage

SA-5 on pad

SA-5 Demensions

apollo_sa7_launch

apollo_sa4

Posted on June 4, 2015

A few seconds after liftoff, a fin-vane at the base of the booster stuck and started the 13-meter-tall spacecraft-booster combination spinning like a bullet. Twenty-six seconds into the flight the vehicle started coming apart. The abort-sensing syste...

a-002

A-001_launch_1964_05_13

Pad_abort_test_1-237×300

Little Joe II- On Pad, Complex 36 (December 7, 1964)

BP12

Apollo_LJ_II_flight_profile

a-001 bp-12

A pad abort test at White Sands, left, helped determine that the launch escape system could propel the Apollo command module away from danger if a Saturn launch vehicle explosion should threaten

A desert area at White Sands Test Facility, New Mexico, was used for testing the spacecraft propulsion system module

Posted on July 9, 2015

The key to high-energy stages was to use liquid hydrogen as the fuel.  Liquid hydrogen fuel appealed to rocket designers because of its high specific impulse, which is a basic measure of rocket performance. Specific Impulse is the impulse delivered p...

4-SIV-SIVB

3-Saturn 1b-V

2-Cutaways

1- SIV_rocket_stage

Posted on July 16, 2015

The Pegasus satellite was named for the winged horse of Greek mythology.  Like its namesake, the Pegasus was notable for its “wings”, a pair of 29 meter long, 4.3 meter wide arrays of 104 panels fitted with sensors to detect punctures by micrometeoro...

4- Saturn_SA10_launch

Saturn_SA8_launch

2- The SA-9

8- Pegasus_Deployment_sequence

7- Cutaway views show the interior of the command module (for clarity, the center couch is not shown)

6- Pegasus Deployed

5- Pegasus Stowed

4- Saturn_SA10_launch

Posted on August 20, 2015

Apollo Saturn 201 employed the Saturn IB launch vehicle, which  was the up-rated version of the Saturn I rocket flown in ten earlier Saturn-Apollo missions. It featured an upgrade of the first stage engines to increase thrust from 1,500,000 lb-ft of ...

AS-203_launch

AS-202_launch

AS-201_launch

Apollo-Saturn 201 mission – launch, recovery