Space Rocket History Logo
Space Rocket History Podcast Welcome to the Space Rocket History podcast

Episodes Tagged with "Rendezvous"

Posted on February 12, 2015

In January 1960, President Eisenhower directed NASA Administrator Glennan to accelerate the Super Booster Program that had recently been assigned to NASA. This order ensured the transfer of the von Braun group from the Army Ballistic Missile Agency t...

Using a model at upper left, William Rector of General Dynamics Corp. describes the design his company proposed for the Apollo lunar mission

Spacecraft modules in this drawing were identified in the Space Task Group’s request for proposals from contractors for developing and producing the command module

Saturn 1 test

Saturn 1 test 2

mySuperLamePic_c1194b7fa9498eb5af694d8530d3ebf8

At lower left, E. E. Clark and Carlos de Moraes of the Martin Company display three of a dozen command module configurations considered before the choice of the one to the right

ASA’s second Administrator, James E. Webb (at center above), and George M. Low (right above) of NASA Headquarters receive a model of General Electric’s proposed vehicle

Posted on February 19, 2015

In May 1961, NASA was not really prepared to direct an enormous Apollo program designed to fly its spacecraft to the moon. New and special facilities would be needed and the aerospace industry would have to be marshaled to develop vehicles not easily...

David G. Hoag, technical design director at the laboratory, examines the inertial measuring unit that would measure changes in Apollo spacecraft velocity when propulsion systems were fired

MIT Instrumentation Laboratory Director C. Stark Draper inspects a mockup of the Apollo guidance and control system in the September 1963

astronaut positions

Posted on February 26, 2015

Max Faget thought the first stage of the moon rocket should use four solid-fueled engines, 6.6 meters in diameter.  He reasoned these could certainly accomplish whatever mission was required of either the Saturn or Nova, and it would be more cost eff...

John_Houbolt_and_LOR2

Earth Orbit Rendezvous

Apollo_Direct_Ascent

Posted on March 5, 2015

Many historians agree, the U.S. took its first step toward the moon in the spring of 1957, four years before President Kennedy declared the national goal of landing a man on the Moon, and returning him safely to the Earth. While still preparing for t...

12-Second stage (S-IV)

11-Booster stage (S-I)

10-Proposed C-2

9-C-1 and earlier vehicles

8-Model of blockhouse at Launch Complex 34

7-Vehicles using Titan and Atlas stages

6-Saturn C

5-Saturn B

4-Preliminary concept of Launch Complex 34, Cape Canaveral

3-Early H-1 Engine

2-Thor-Jupiter engine

1-Proposed configuration of a clustered booster

Posted on March 12, 2015

Just as launch complex 34 dwarfed its predecessors, Saturn’s checkout represented a new magnitude in launch operations. The Saturn C-1 stood three times higher, required six times more fuel, and produced ten times more thrust than the Jupiter. Its si...

Lifting the first stage from the transporter

Hoisting the stage in vertical attitude

Erecting the upper stages

Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles

16-Unloading Compromise in Florida

15-S-I and S-IV stages aboard the Compromise

14-Booster movement around Wheeler Dam

11-Launch Complex 34

10-Configurations of Saturn flight vehicles

9-Saturn Barge route

7-Six-engine configuration of the S-IV stage

6-Redesigned tail of the Saturn booster

5- The barge Palaemon

3-First horizontal mating of the Saturn vehicle

2-Movement of dummy S-IV stage to checkout

Posted on March 18, 2015

No previous maiden launch had gone flawlessly, and the Saturn C-1 was considerably more complicated than any rocket launched thus far. Launch Operations Directorate officials gave the rocket a 75% chance of getting off the ground, and a 30% chance of...

To assemble the large Saturns, NASA needed a plant, preferably one already built. The Michoud facility (above), close to New Orleans, suited the requirements

Saturn_SA1_on_launch_pad

Modules of the Apollo spacecraft were tested in Florida in the Manned Spacecraft Operations Building. Above, NASA officials Walt Williams, Merritt Preston, Kurt Debus, Brainerd Holmes, and Wernher von Braun

Maiden launch of the Apollo program- Saturn SA-1 from Cape Canaveral, 27 October 1961

First Saturn Launch

Liftoff of Saturn I. Note the long cable mast falling away on the right

mySuperLamePic_c001b3d7f61bec278243523bf2e79253

Abe Silverstein, NASA’s Director of Space Flight Development, is shown touring a rocket engine facility

1-Launch Complex 34, blockhouse interior

Posted on March 26, 2015

The mode that Apollo would use to land on the moon was the most studied, analyzed, and debated decision made for the lunar landing program.  There were four main choices Direct-ascent, Earth-Orbit Rendezvous, Lunar-Orbit Rendezvous, and Lunar Surface...

two landing techniques proposed for the direct ascent mode

SA-1

RendezvousMethods

proposed lunar-surface-rendezvous procedure, a propellant-transfer vehicle takes fuel from the tanker to a manned space vehicle. After loading the fuel, the two astronauts would fire the engine of their spacecraft to return to the earth

Major configuration changes in the Apollo spacecraft from May 1960 to July 1962

Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles

A ferry that would leave a command ship in orbit around the moon, visit the lunar surface, and then return to the command ship for the voyage back to the earth

Posted on April 2, 2015

Langley’s brochure for the Golovin Committee described Lunar landers of varied sizes and payload capabilities.  There were illustrations and data on a very small lander that was able to carry one man for 2 to 4 hours on the moon.  There was an “econo...

Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles

NASA announced selection of the lunar-orbit-rendezvous landing technique at an 11 July 1962 press conference. left to right James E. Webb, Robert C. Seamans, Jr., D. Brainerd Holmes, and Joseph F. Shea

Harry C. Shoaf (Space Task Group Engineering Division 15 November 1961 of a proposed lunar lander to be used with an advanced version of the Mercury spacecraft

concept of a small lunar lander during descent to the surface of the moon, as proposed by Langley Research Center employees in October 1961

Posted on April 9, 2015

Posted on April 16, 2015

After viewing the Apollo spaceport being built in Florida, President Kennedy flew on to Huntsville, Alabama. There, during a tour of Marshall and a briefing on the Saturn V and the lunar-rendezvous mission by von Braun, Jerome Wiesner interrupted Von...

REF: 2-903-6 SA-2 LAUNCH AT CAPE. IGNITION OF ROCKET (SATURN 1 VEHICLE)

SA-2 erected on launch pedestal

Wernher_von_Braun_confers_with_Brainerd_Holmes_and_Nicholas_Golovin

Posted on January 23, 2014

This brings us to Project Gemini.  Gemini started after Apollo had begun, in part to answer a crucial question for Apollo. Was rendezvous and docking in orbit a feasible basis for a manned lunar landing mission?

fig6 (1)McDonnell-proposed two-man Mercury spacecraft. Shown is the interior arrangement of spacecraft equipment

fig4

fig3

Posted on May 29, 2014

Posted on June 5, 2014

From the previous episode, it was decided that the name of Gemini VI would be changed to Gemini VI-a to distinguish it from the originally planned mission whose objective was to rendezvous with the Agena target vehicle. Gemini VII would be launched f...

GT7 Launch

gemini7patch

Lovell before the launch, in the special G5C space suit, which had a zippered hood with a visor instead of a solid helmet

Gemini_7_Crew_(Lovell_und_Borman)

Moon and clouds over the Western Pacific as seen from Gemini 7

Borman and lovell boarding

Posted on June 12, 2014

From the previous episode, we have Gemini VII waiting in orbit for Gemini VI-A to launch and rendezvous.  Remember, Gemini VII could only remain in orbit for 14 days, the maximum duration of its flight.  The goal was to launch Gemini VI-A on or befor...

Gemini_VI_Launch_-_GPN-2000-000612

Gemini_7_in_orbit_-_GPN-2006-000035

Gemini_6_Views_Gemini_7

Gemini 6 harmonica

1200px-Gemini_6_launch_abort

Hint for G6

Gemini_VI_Stafford_capsule

Gemini 7 as seen by Gemini 6

Posted on June 18, 2014

The Gemini Program was conceived after it became evident to NASA officials that an intermediate step was required between Project Mercury and the Apollo Program. The major objectives assigned to Gemini were: 1-To subject two men and supporting equip...

G7 crew

GT on Wasp

Gemini 7 spacecraft on display at the Steven F. Udvar-Hazy Center

Recovery of G7

Hellicopter over G6

GT7 on Wasp

G6&7 on Wasp

G7 Before Splashdown

G7 Arrive on Wasp

Posted on July 17, 2014

Many doubted that Agena could be ready in time to meet Gemini’s tight launch schedules. The end of 1965 saw Agena’s usefulness in manned space flight once again called into question, but this time time a substitute target had already been approved fo...

gemini_atv_8

Gemini Augmented Target Docking Adapter during pre-flight checkout

gemagena

agenhgre

800px-S66-25781_PR

facebook hint

Posted on July 24, 2014

On September 20th 1965, NASA named the crew for Gemini VIII. The command pilot selected was Neil Armstrong, a civilian test pilot with much experience in the X-15 rocket research aircraft program. David Scott was selected as pilot.  Scott was the fir...

Niel and David

Neil_Armstrong_in_Gemini_G-2C_training_suit

neil_armstrong_david_scott

Neil_Armstrong_1956_portrait

gemini8 at air and space museum Wapkoneta ohio

Gemini-VIII-flight-crew-SCOTT-David-R.-and-ARMSTRONG-Neil-A.

GEMINI-TITAN-8_-_PRELAUNCH_ACTIVITY

gemini_atv_8

gemini_8

Gemini 8 water egress test

F9F-2_Panthers_VF-51_over_Korea_1951 with Armstrong piloting

David Scott

Gemini-VIII-flight-crew-SCOTT-David-R.-and-ARMSTRONG-Neil-A.

Posted on July 30, 2014

This was the most complex mission attempted to date. The primary mission objectives were to perform rendezvous and four docking tests with the Gemini Agena Target Vehicle (GATV) and to execute an ExtraVehicular Activity (EVA)…

gatv_diagram_labelled

Agena view from G8

640px-Gemini_8_during_rescue

Gemini_8_launch

Gemini_8_docking with agena

Gemini_8_Atlas-Agena_launch

Posted on August 7, 2014

Armstrong eased Gemini VIII toward the target at a barely perceptible speed of 8 centimeters per second. Then Armstrong gleefully reported, “Flight, we are docked!” For a brief moment, the flight controllers in Houston did not realize they had really...

G8 Ohio A&

gemini8 at air and space museum Wapkoneta ohio

G8

Posted on August 28, 2014

After the untimely deaths of Elliot See and Charles Basset, NASA assigned the Gemini IX prime crew positions to Tom Stafford and Gene Cernan.  This was the first time in NASA’s manned space flight history that a backup crew had taken over a mission. ...

Gemini_9Acrew

g9patch

AtlasAgenaG9a

Posted on September 4, 2014

As contractors worried about technical problems with the Atlas, Once again NASA, faced the necessity for a quick recovery plan when a target vehicle failed to reach orbit. You may recall the first time was with Gemini 6.  But this time Nasa had somet...

AugmentTargetDockingAdapter

tom Stafford in orbit

hint for facebook

Posted on September 11, 2014

We left off last week with Tom Stafford and Gene Cernan completing three rendezvous with the ATDA but, no docking because the shroud was still in place on the Docking Adapter. On June 5, 1966 at 5:30 a.m., nearly 45 hours and 30 minutes into the miss...

Gemini 9 splashes down at 9-00 A.M., June 6, 1966. The day of the EVA was also their last in space

gemini9_crew_a

Gem9down-S66-34118

eugene_cernan

cernan_gt9_eva

Posted on September 18, 2014

Deputy Administrator Seamans wanted a mission review board created to study: (1) Corrective measures for the Atlas-Agena failure (2) The guidance update problem that delayed the launch two days (3) The shroud incident (4) The suit environmental c...

KSC-66P-0323

KSC-66P-0317

gemini-10-astronaunt-michael-collins-pilot-for-nasa

Gemini 9 astronauts Gene Cernan and Tom Stafford brief Gemini 10 astronauts John Young and Mike Collins. And….how about that nice ATDA model in full gator

640px-Gemini10crew

Posted on September 25, 2014

“At first, the sensation I got was that there was a pop, then there was a big explosion and a clang. We were thrown forward in the seats. We had our shoulder harnesses fastened. Fire and sparks started coming out of the back end of that rascal. The l...

John Young in Gemini 10

Gemini_10_launch_time_exposure_-_GPN-2006-000036

Gemini 10 Agena

Ge10Patch_orig

Collins shortly after launch

Agena_Firing_-_GPN-2000-001355

Posted on October 2, 2014

Collins emerged from the spacecraft at dawn. Like Gene Cernan on Gemini IX-A, he found that all tasks took longer than he expected. But he was able to retrieve the package from the exterior of his spacecraft…

gemini-10_recovery

gemini_11_splashdown_recovery_print-r5a59c8d7c6244f54af0dc3eba26b9a72_wa3_8byvr_512

G10RecoveryCertificate

DaveG10

Posted on October 9, 2014

Some significant goals had been set for the last two Gemini flights. For example, the Apollo Spacecraft Program Office wanted a rendezvous in the first spacecraft orbit, which would simulate lunar orbit rendezvous. There was also interest in linking ...

scan0704

RichardFGordon

320px-Gemini_11_patch

agena 11

Gemini_11_prime_crew_(Gordon_and_Conrad)

Gemini_11_Gordon_suits_up for G11

Posted on October 16, 2014

Conrad shouted to Gordon “Ride ’em, cowboy!”  Gordon was Riding bareback, with his feet and legs wedged between the docked vehicles. In practice sessions in zero-g aircraft flights, Gordon had been able to push himself forward, straddle the reentry a...

Gordon Astride Agena

agena 11

1024px-Gemini_Profiles

Posted on October 23, 2014

The rotation rate checked out at 55 degrees per minute, and the crew could now test for a minute amount of artificial gravity. When they put a camera against the instrument panel and then let it go, it moved in a straight line to the rear of the cock...

Recovery of G11

mySuperLamePic_4b6522ec730b0c0a85b7ed20f7c4f00f

G11 parachute

Agena Tether Experiment

Posted on October 30, 2014

When the  Gemini IX-A Agena fell into the Atlantic Ocean, Gemini XII was threatened with a major hardware shortage of an Agena and an Atlas to launch it. Replacing the Agena was no real problem. Lockheed’s first production model, 5001, used for devel...

p3-AldrinLovell

p2-Aldrin Lovell Cernan Cooper

p-1G12Patch

gemini-12_2

Agena12

Posted on November 6, 2014

In space, Jim and Buzz began to wonder if everything had been shut down too soon. For 25 minutes, with one brief exception, they heard nothing from the ground. The Ascension Island tracking station had the wrong acquisition time, so its communicators...

Agena12tether

buzzViewHatchOpen

Gemini_XII_Mission_Image_-_Solar_Eclipse

G12 tether

buzzadrinview

Posted on November 13, 2014

Posted on January 29, 2015

President Kennedy proposed the manned lunar landing as the focus of the US space program but, at the time of his address, only one American, Alan B. Shepard, Jr. had been into space, on a suborbital lob shot lasting 15 minutes. No rocket launch vehic...

c012a

GilruthThompsonGlennan

c010

c002c

c002b

c002a

Posted on February 5, 2015

The goal of the nation’s space program should be the scientific exploration of the moon and the planets but also to recognize that nontechnical factors are vital to public acceptance of a space program. Human exploration of the moon and planets would...

glenn-kennedy_300_241_s_c1

ST-69-4-63