Jul 17

Space Rocket History #71 – Agena vs. the Augmented Target Docking Adapter, with Some EVA Equipment on the Side

Many doubted that Agena could be ready in time to meet Gemini’s tight launch schedules. The end of 1965 saw Agena’s usefulness in manned space flight once again called into question, but this time time a substitute target had already been approved for development…

The Guys

The Guys

Agena

Agena

ATDA

ATDA

Gemini-Agena

Gemini-Agena

Agena Hangar

Agena Hangar

Jun 18

Space Rocket History #68 – Gemini VI & VII with Wally Schirra, Tom Stafford, Frank Borman, and Jim Lovell – Rendezvous – Part 4

The Gemini Program was conceived after it became evident to NASA officials that an intermediate step was required between Project Mercury and the Apollo Program. The major objectives assigned to Gemini were:
1-To subject two men and supporting equipment to long duration flights — a requirement for projected later trips to the moon or deeper space.
2-To effect rendezvous and docking with other orbiting vehicles, and to maneuver the docked vehicles in space, using the propulsion system of the target vehicle for such maneuvers.
3-To perfect methods of reentry and landing the spacecraft at a pre-selected land-landing point.
4-To gain additional information concerning the effects of weightlessness on crew members and to record the physiological reactions of crew members during long duration flights.

By Dave.

By Dave.

Helicopter over G6

Helicopter over G6

G6 on USS Wasp

G6 on USS Wasp

G7 Before Splashdown

G7 Before Splashdown

G7 in the Water

G7 in the Water

G7 Crew on Wasp

G7 Crew on Wasp

G7 Crew on Wasp

G7 Crew on Wasp

Welcome Ceremony

Welcome Ceremony

G6 & 7 on Wasp

G6 & 7 on Wasp