Space Rocket History Logo
Space Rocket History Podcast Welcome to the Space Rocket History podcast

Episodes Tagged with "Robert Gilruth"

Posted on August 27, 2015

Christopher Columbus Kraft Jr. was Born on February 28, 1924 in a town that no longer exist, Phoebus, Virginia. The town has now been engulfed by Hampton, Virginia. Kraft was named after his father, Christopher Columbus Kraft, who was born in New Yor...

3-Christopher_Kraft,_flight_director_during_Project_Mercury,_works_at_his_console_inside_the_Flight_Control_area_at_Mercury_Mission_Control

2-Wally Schirra (right) consults the flight plan for his Mercury-Atlas-8 (MA-8) mission with Flight Director Chris Kraft

1-Chris Kraft and Rober Gilruth

Posted on September 3, 2015

At the beginning of the Apollo program, Kraft retired as a flight director to concentrate on management and mission planning. In 1972, he became director of the Manned Spacecraft Center, following the path of his mentor Robert Gilruth.

3-Robert F. Thompson (center) and Christopher C. Kraft Jr. (right) brief Rear Admiral W.C. Abhau

2-Kraft with his new flight directors before the Gemini 4 mission Clockwise from lower right Kraft, Gene Kranz, Glynn Lunney and John Hodge

1-Kraft Kranz Gemini Fuel Cell problem

Posted on September 10, 2015

As Procedures Officer, Kranz was put in charge of integrating Mercury Control with the Launch Control Team at Cape Canaveral, Florida, writing the “Go/NoGo” procedures that allowed missions to continue as planned or be aborted, along with serving as ...

3-Kranz and his teacher Kraft

2-Kranz at his console on May 30, 1965, in the Mission Operations Control Room, Mission Control Center, Houston

1-Kranz-F86 Sabre Cat

Posted on September 17, 2015

While flight-preparation crews were having problems, Grissom, White, and Chaffee were finding bottlenecks in training activities. The chief problem was keeping the Apollo mission simulator current with changes being made in spacecraft 012.

3-Astronauts Grissom, Chaffee, and White check the communications headgear in preparation for what was to have been the first manned Apollo flight – Apollo-Saturn 204, scheduled for 21 February 1967

2-CM-012 – Apollo One- arrives at Kennedy Space Center, 26 August 1966

1-Command module 012 and service module 012 in workstands at the North American Aviation plant, Downey, in 1965

Posted on October 1, 2015

“So the reason I took those symbols was that I think this was the most important thing I had going for me, and I felt that while I couldn’t take one for every religion in the country, I could take the three I was most familiar with.”  Ed. White

Chaffee, White, and Grissom

apollo1-sketch-jg

the-Apollo-1-launch-pad-fire-that-killed-astronauts-Gus-Grissom-Roger-Chaffee-and-Ed-White-celebrities-who-died-young-31704639-1372-740

Posted on October 8, 2015

“On my honor I will do my best, To do my duty to God and my country and to obey the Scout Law; To help other people at all times;  To keep myself physically strong, mentally awake, and morally straight.” The Boy Scout Oath.

3-Apollo_1_patch

2-apollo1chaffee

1-Chaffee at the consoles in Mission Control during the Gemini 3 mission

Posted on October 15, 2015

The “Plugs Out” test scheduled for Jan 27, 1967 was not the first time that spacecraft 12 had been put through a simulated run with people on board…

1-1024px-AS-204_-_hatch

3-PrimeandBackupCrews

2-PrimeCrewAltitudeChamberTest

Posted on October 22, 2015

When Deke Slayton and Stu Roosa arrived at pad 34 they saw ambulances waiting in vain at the base of the launch tower.  They boarded the small elevator and rode to level A-8, 218 feet up, and headed across the swing arm to the clean room…

3-apollo

2-c216a

1-Apollo_1’s_Command_Module_-_GPN-2003-00057

Posted on October 29, 2015

The tragedy of Apollo 1 was widely reported in the Soviet Union. The Soviets sent condolences and letters to the families of the men who had died. But, the Soviet Press criticized the US for an overzealous attempt to send men to the moon.

CM parts were studied and catalogued in the Pyrotechnics Installation Building at Kennedy Space Center.

The CM wiring harness goes through x-ray inspection.

apollo-1-disassembly

Posted on November 5, 2015

What went wrong?  Even years after the investigators began to sift through the wreckage of Apollo 1 piece by piece, no one could say exactly.  But within weeks the general picture became clear:  The fire was a disaster waiting to happen.

Deputy Administrator Seamans, Administrator Webb, Manned Space Flight Administrator George E. Mueller, and Apollo Program Director Phillips testify before a Senate hearing on the Apollo accident

2-Apollo1Langley

1-Apollo1 Inve

Posted on November 12, 2015

Posted on February 4, 2016

“The S-II stage was a nightmare the minute it was conceived, and it only got worse from there. During the course of its creation, it would grind up people and careers the way the transcontinental railway devoured laborers.  Though the methods and mat...

5-Test firing of a Saturn V second stage rocket S-II

6-s-ii-subassemblies

4-S-II_Inboard_1963

3-The S-II stage during stacking operations of Apollo 6 in the VAB

2-S-2 assembly building in Seal Beach, CA

1=7s-ii-cut-away-w-callouts

1=6s-ii-subassemblies-sm

1-Saturn_V_second_stage

Posted on June 13, 2013

Candidates were given continuous psychiatric interviews throughout the week, and extensive self-examination through a battery of 13 psychological tests for personality and motivation, and another dozen different tests on intellectual functions and sp...

Cent

gustraining

GPN

Centrifuge

Scott

472046main_GPN-2000-000596-4x3_946-710

gustraining

Posted on June 20, 2013

On April 1, 1959, Robert Gilruth, the head of the Space Task Group, Charles Donlan, Warren North, and Stanley White selected the first American astronauts. The “Mercury Seven” were Scott Carpenter, L. Gordon Cooper, Jr., John H. Glenn, Jr., Virgil I....

m7-capsule

Mercury 7

Posted on December 14, 2016

With the passing of John Glenn last week, I thought it would be appropriate to pause my coverage of Apollo 10 for a week and create an episode that celebrates the life of the American Icon, John Glenn.  I covered John Glenn’s Mercury flight in episod...

174537main_glenn_john_hr_1

2-sen-john-glenn

1-jgma6

Posted on September 19, 2013

“I am in a big mass of some very small particles, they’re brilliantly lit up like they’re luminescent. I never saw anything like it! They round a little: they’re coming by the capsule and they look like little stars. A whole shower of them coming by....

space rocket history pic21

Mercury-Atlas_6_Earth_photo

Launch_of_Friendship_7_-_GPN-2000-000686

Houston_control_center_during_Mercury_Atlas_6_mission_1962

Glenn62

800px-Glenn_Enters_his_Mercury_Capsule_-_GPN-2000-001029

415px-Mercury_6,_John_H_Glenn_Jr

Posted on August 2, 2024

Before joint missions, such as Apollo and Soyuz, could take place, both nations had to find a compelling rationale for cooperation, ultimately overcoming the seemingly insurmountable barriers to foster genuine cooperative space projects.

Laika

Astronaut John Glenn & President J.F. Kennedy

3-B-Drydebn

1-Yuri

Posted on August 16, 2024

In 1969, NASA Administrator Thomas O. Paine saw an opportunity for a paradigm shift in Soviet-American space relations. Given the United States’ clear lead in the race to the moon, he believed an offer of cooperation would not jeopardize the US luna...

1-p102

3-p108b

2-p108a

Posted on August 30, 2024

Lunney and his colleagues were especially captivated by the descriptions of the Soyuz control systems provided by Shatalov and Beregovoy. While immersed in the U.S. space programs, the NASA representatives could only follow the U.S.-U.S.S.R. competit...

3-left to right,Johnson,Hardy,Krimer,Frutkin, and Gilruth

2-Soyuz

1-ringandcone

Posted on September 14, 2024

On January 20th, 1971 in private negotiation, Low and Frutkin met with Keldysh and Feoktistov to discuss rendezvous and docking. NASA proposed developing compatible systems for Apollo and Soyuz rather than future spacecraft, aiming to give specialist...

P-1Academician Aleksandr Pavlovich Vinogradov, left, examines a lunar rock collected on the Apollo 12 mission

P-3 Academician Keldysh below headed the delegations and signed the agreements Soviet Academy of Sciences photos)

P-2 At the Presidium of the Soviet Academy of Sciences, the Soviet and American negotiators face one another at the conference table in January 1971

Posted on September 28, 2024

Two options were presented: Apollo docking with Salyut/Soyuz or Soyuz with Skylab/Apollo. Caldwell Johnson was taken aback by the Soviets’ eagerness to immediately pursue the development of a universal docking mechanism.

3-Apollo Salyut

2-Soyuz Skylab

1-Apollo-Soyuz-Astronomy

Posted on October 11, 2024

The spacecraft designers led by Caldwell Johnson faced a demanding task. Director Gilruth urged them to accelerate the development of the docking adapter design, aiming to have a functional model ready for the upcoming November meeting with the Sovie...

1-Apollo-Salyut Hardware

2-Compatable Rendezvous Systems

3-Preliminary DM

Posted on October 25, 2024

Finally Kraft and Gilruth told the Soviets that if they were unwilling to agree to the telephone conversations then the NASA delegation might as well pack up and go back to Houston. After some hesitation, the Soviets decided to try the telephone tele...

2-Docking

Screenshot

1-Docking

Posted on November 8, 2024

In a re-evaluation of the proposed test mission, the Soviets concluded that utilizing the Salyut spacecraft would not be technically and economically viable.

3-Vladimir Kotelnikov

2-Konstantin Bushuyev

1-alexey-petrov-1

Posted on November 22, 2024

In April of 1972, George Low returned to Washington from Moscow and briefed Henry Kissinger. He conveyed NASA’s assessment that a joint space mission in 1975 was feasible.

P2-Soviet two-fifths-scale model of their version of the ASTP docking system

P1- Nixon Kosygin summit

P3-Apollo communications links

Posted on December 6, 2024

According to George Low, the Soviet mission operations control room was quite large – it contained 16 two-man consoles, thus allowing them 32 flight controllers. In addition, there was a back row of consoles which were used for personnel such as the ...

P1-star-city-russia

P2-Cosmonaut-Training-Center-Star-City-Aerial-View

P3-MCC-Kaliningrad

Posted on December 20, 2024

For the first time, the Soviet Union publicly announced the crew assignments for a Soyuz mission before the flight. Previously, cosmonaut identities were kept secret until after their flights.

P1-ac

P3-Rest stop during trip from Star City to Moscow provides crewmen with a chance for a snowball fight November 1973

P2- ASTPmockat 73Paris

Posted on January 10, 2025

The American astronauts acknowledged the necessity of enhancing their Russian language proficiency. They observed that their Russian counterparts, had demonstrated a remarkable commitment to learning English, dedicating 6 to 8 hours each day to indiv...

P2-Spacecraft Simulators at Star City

P1-Interior view of environmental control system

P3-Docking systems installed on a simulator

Posted on January 24, 2025

Soyuz 16 served as a comprehensive rehearsal for the Soviet contribution to Apollo-Soyuz Test Project (ASTP).

P1-soyuz16Crew

 ÓÒÏÓ̇‚Ú ÕËÍÓÎ‡È –Û͇‚˯ÌËÍÓ‚

P2-Anatoli Filipchenko

Posted on January 30, 2014

“The main trouble with the Mercury capsule was that most system components were in the pilot’s cabin; and often, to pack them in this very confined space, they had to be stacked like a layer cake and components of one system had to be scattered about...

The operating principle of the fuel cell designed by General Electric, adopted for use in the Gemini spacecraft

modified Titan II booster

Gemini spacecraft to be released publicly

Adapter Section of Mark II

Four stages in a rendezvous mission as conceived early in 1962

An artist’s version of the use of ejection seats to escape from the Gemini spacecraft

fig8 proposed lunar lander to be used with an advanced version of the Mercury spacecraft

Posted on February 27, 2014

One second after 11 o’clock Wednesday morning, April 8th 1964, the Titan II booster’s first-stage engine ignited. Four seconds later, the 156 ton vehicle lifted from the pad on that curiously lambent flame so distinctive of Titan II’s hypergolic prop...

Tang

space rocket history pic69

Gemini1-1

Gemini Launch

Gemini 1 Left Instrument Pallet

Gemini 1 Experiment Pallets

Posted on March 13, 2014

Gemini Launch Vehicle Two’s misfortunes during August and September 1964 forced NASA to forego its goal of a manned Gemini 3 flight before the end of the year, Gemini-Titan 2 was now scheduled for mid-November 1964, and Gemini 3 for the end of Januar...

800px-Gemini2xrear

Gemini B spacecraft on display at the Air Force Space & Missile Museum, Cape Canaveral Air Force Station, Florida

View of the earth and space from the unmanned Gemini 2 cabin window during reentry

Posted on April 3, 2014

The precise scope of the Gemini 3 mission remained uncertain until very nearly the eve of flight. In April of 1963, the GT-3 mission directive was “to demonstrate and evaluate the capabilities of the spacecraft and launch vehicle system, and the proc...

gemin3 panel

Gemini3youngandgriss

Gemini3

Gemini3_water_training

Astronaut_John_Young_gemini_3

Astronaut Roger B. Chaffee is shown at console in the Mission Control Center, Houston, Texas during the Gemini-Titan 3 flight.

800px-S65-18058

799px-Gemini3_crew

Posted on April 10, 2014

Grissom – What is it? Young: Corned beef sandwich. Grissom: Where did it come from? Young: I brought it with me. Let’s see how it tastes. Smells, doesn’t it. Grissom: Yes, its breaking up. I’m going to stick it in my pocket. Young: Is it? It was...

Gemini3 Carrier

Gemini 3 View

569462main_eagle_has_landed

Unsinkable

Launching of the first manned Gemini flight.

Posted on April 24, 2014

Posted on May 1, 2014

For the first time Television coverage of the launch had an international audience, as the scene was broadcast to 12 European nations via Intelsat 1 aka the Early Bird satellite of episode 59. Heightened by the prospect of an EVA and the first use of...

Spacewalk

Manned Maneuvering Unit

Gt4Patch

gemini-4

gemini-4_landing

Gemini_4_Outside_National_Air_and_Space_Museum

Gemini 4 recovery

Gemini 4 launch

Gemini 4 inside national air and space

Gemini -24 scale model

Ed white

G4 button

Posted on May 8, 2014

On orbit 48, after 75 hours of flight a problem arose. During a pass over the continental US the flight computer was updated. McDivitt was told to switch off the computer. He flipped the switch but the computer did not turn off. On the ground at miss...

Food packages of beef and gravy fully reconstituted and ready to eat. The water gun is used to reconstitute dehydrated food and the scissors are used to open the packages to eat

This package of spacefood, like the ones carried aboard Gemini missions, contains a complete meal combination, which consists of entree, vegetables and dessert. Additionally, it has a package of drink crystals

This meal includes a beef sandwich, strawberry cereal cubes, peaches, and beef and gravy. Astronauts used a water gun to reconstitute the food and scissors to open the package

Posted on May 15, 2014

By this time the Astronauts were thinking about a nickname for their spacecraft, but NASA Headquarters now officially refused to allow nicknames for Gemini spacecraft. However, Gordo Cooper was not so easily put off. Pete Conrad’s father-in-law had w...

gordo recovery

Gemini5insignia

gemini5-surrounded-by-mcdonnell-works-during-checkout-240×310

Gemini5-splashdown

Gemini5-cockpit-pre-launch

gemini-v-crew

gemini-5-cape-kennedy-240×242

gemini-5-baja-california

Gemini-5_Gordon_Cooper_recovery

Gemini_5_Radar_Evaluation_Pod

Gemini_5_on_the_pad_19

Gemini_5_Fuel Cell

Dave Hint

Posted on May 22, 2014

Posted on May 29, 2014

Posted on June 5, 2014

From the previous episode, it was decided that the name of Gemini VI would be changed to Gemini VI-a to distinguish it from the originally planned mission whose objective was to rendezvous with the Agena target vehicle. Gemini VII would be launched f...

GT7 Launch

gemini7patch

Lovell before the launch, in the special G5C space suit, which had a zippered hood with a visor instead of a solid helmet

Gemini_7_Crew_(Lovell_und_Borman)

Moon and clouds over the Western Pacific as seen from Gemini 7

Borman and lovell boarding

Posted on June 12, 2014

From the previous episode, we have Gemini VII waiting in orbit for Gemini VI-A to launch and rendezvous.  Remember, Gemini VII could only remain in orbit for 14 days, the maximum duration of its flight.  The goal was to launch Gemini VI-A on or befor...

Gemini_VI_Launch_-_GPN-2000-000612

Gemini_7_in_orbit_-_GPN-2006-000035

Gemini_6_Views_Gemini_7

Gemini 6 harmonica

1200px-Gemini_6_launch_abort

Hint for G6

Gemini_VI_Stafford_capsule

Gemini 7 as seen by Gemini 6

Posted on June 18, 2014

The Gemini Program was conceived after it became evident to NASA officials that an intermediate step was required between Project Mercury and the Apollo Program. The major objectives assigned to Gemini were: 1-To subject two men and supporting equip...

G7 crew

GT on Wasp

Gemini 7 spacecraft on display at the Steven F. Udvar-Hazy Center

Recovery of G7

Hellicopter over G6

GT7 on Wasp

G6&7 on Wasp

G7 Before Splashdown

G7 Arrive on Wasp

Posted on July 17, 2014

Many doubted that Agena could be ready in time to meet Gemini’s tight launch schedules. The end of 1965 saw Agena’s usefulness in manned space flight once again called into question, but this time time a substitute target had already been approved fo...

gemini_atv_8

Gemini Augmented Target Docking Adapter during pre-flight checkout

gemagena

agenhgre

800px-S66-25781_PR

facebook hint

Posted on July 24, 2014

On September 20th 1965, NASA named the crew for Gemini VIII. The command pilot selected was Neil Armstrong, a civilian test pilot with much experience in the X-15 rocket research aircraft program. David Scott was selected as pilot.  Scott was the fir...

Niel and David

Neil_Armstrong_in_Gemini_G-2C_training_suit

neil_armstrong_david_scott

Neil_Armstrong_1956_portrait

gemini8 at air and space museum Wapkoneta ohio

Gemini-VIII-flight-crew-SCOTT-David-R.-and-ARMSTRONG-Neil-A.

GEMINI-TITAN-8_-_PRELAUNCH_ACTIVITY

gemini_atv_8

gemini_8

Gemini 8 water egress test

F9F-2_Panthers_VF-51_over_Korea_1951 with Armstrong piloting

David Scott

Gemini-VIII-flight-crew-SCOTT-David-R.-and-ARMSTRONG-Neil-A.

Posted on July 30, 2014

This was the most complex mission attempted to date. The primary mission objectives were to perform rendezvous and four docking tests with the Gemini Agena Target Vehicle (GATV) and to execute an ExtraVehicular Activity (EVA)…

gatv_diagram_labelled

Agena view from G8

640px-Gemini_8_during_rescue

Gemini_8_launch

Gemini_8_docking with agena

Gemini_8_Atlas-Agena_launch

Posted on August 7, 2014

Armstrong eased Gemini VIII toward the target at a barely perceptible speed of 8 centimeters per second. Then Armstrong gleefully reported, “Flight, we are docked!” For a brief moment, the flight controllers in Houston did not realize they had really...

G8 Ohio A&

gemini8 at air and space museum Wapkoneta ohio

G8