Episodes Tagged with "Air Force"
Posted on March 5, 2015
12-Second stage (S-IV)
11-Booster stage (S-I)
10-Proposed C-2
9-C-1 and earlier vehicles
8-Model of blockhouse at Launch Complex 34
7-Vehicles using Titan and Atlas stages
6-Saturn C
5-Saturn B
4-Preliminary concept of Launch Complex 34, Cape Canaveral
3-Early H-1 Engine
2-Thor-Jupiter engine
1-Proposed configuration of a clustered booster
Posted on February 12, 2014
fig58 Astronauts after a training session in desert near Stead Air Force Base, Nevada
Goal
fig54 Instrumented mannequin being lowered into a boilerplate Gemini spacecraft in preparation for a dynamic sled test of the Gemini ejection system
fig52 Gemini launch vehicle 1 undergoing tests in the vertical test facility at Martin’s Baltimore plant
fig51 POGO suppression equipment proved out in the Titan II development program
fig48 Proposed deployment sequence for the ballute stabilization device
fig47 Titan II flight N-15 was launched from Cape Canaveral on January 10, 1963
Posted on February 20, 2014
fig70 Gemini-Titan 1 during Electronic-Electrical Interference Tests with the launch vehicle erector lowered
fig68Gemini boilerplate 3A in the production area at the McDonnell plant before being shipped to Weber Aircraft
fig66Sequence Compatibility Firing of the two stages of Gemini launch vehicle 1 at pad 19, Jan. 21
Posted on March 6, 2014
Retro Adapter
Mercury and Gemini
Ejection
Retro Adapter
GT2_S-64-40154
Figure 74. Special instrumentation pallets to be installed in Gemini spacecraft No. 2 in the same positions that astronauts would occupy in later flights
Figure 75. The first stage of Gemini launch vehicle 2 being unloaded from an Air Force C-133 at Cape Kennedy
Posted on January 29, 2015
c012a
GilruthThompsonGlennan
c010
c002c
c002b
c002a
