Episodes Tagged with "Ames Research Center"
Posted on March 18, 2015
To assemble the large Saturns, NASA needed a plant, preferably one already built. The Michoud facility (above), close to New Orleans, suited the requirements
Saturn_SA1_on_launch_pad
Modules of the Apollo spacecraft were tested in Florida in the Manned Spacecraft Operations Building. Above, NASA officials Walt Williams, Merritt Preston, Kurt Debus, Brainerd Holmes, and Wernher von Braun
Maiden launch of the Apollo program- Saturn SA-1 from Cape Canaveral, 27 October 1961
First Saturn Launch
Liftoff of Saturn I. Note the long cable mast falling away on the right
mySuperLamePic_c001b3d7f61bec278243523bf2e79253
Abe Silverstein, NASA’s Director of Space Flight Development, is shown touring a rocket engine facility
1-Launch Complex 34, blockhouse interior
Posted on April 2, 2015
Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles
NASA announced selection of the lunar-orbit-rendezvous landing technique at an 11 July 1962 press conference. left to right James E. Webb, Robert C. Seamans, Jr., D. Brainerd Holmes, and Joseph F. Shea
Harry C. Shoaf (Space Task Group Engineering Division 15 November 1961 of a proposed lunar lander to be used with an advanced version of the Mercury spacecraft
concept of a small lunar lander during descent to the surface of the moon, as proposed by Langley Research Center employees in October 1961
Posted on April 9, 2015
Shea uses models to demonstrate how the lunar module would dock with the command module
Rocket Comparison
Lunar orbit insertion
Posted on April 5, 2024
P3-082879
P1-(Pioneer_11)_launch
P2-Pioneer_f15
P1-Pioneer_11_systems_diagram
