Episodes Tagged with "Lox"
Posted on March 5, 2015
12-Second stage (S-IV)
11-Booster stage (S-I)
10-Proposed C-2
9-C-1 and earlier vehicles
8-Model of blockhouse at Launch Complex 34
7-Vehicles using Titan and Atlas stages
6-Saturn C
5-Saturn B
4-Preliminary concept of Launch Complex 34, Cape Canaveral
3-Early H-1 Engine
2-Thor-Jupiter engine
1-Proposed configuration of a clustered booster
Posted on March 12, 2015
Lifting the first stage from the transporter
Hoisting the stage in vertical attitude
Erecting the upper stages
Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles
16-Unloading Compromise in Florida
15-S-I and S-IV stages aboard the Compromise
14-Booster movement around Wheeler Dam
11-Launch Complex 34
10-Configurations of Saturn flight vehicles
9-Saturn Barge route
7-Six-engine configuration of the S-IV stage
6-Redesigned tail of the Saturn booster
5- The barge Palaemon
3-First horizontal mating of the Saturn vehicle
2-Movement of dummy S-IV stage to checkout
Posted on March 18, 2015
To assemble the large Saturns, NASA needed a plant, preferably one already built. The Michoud facility (above), close to New Orleans, suited the requirements
Saturn_SA1_on_launch_pad
Modules of the Apollo spacecraft were tested in Florida in the Manned Spacecraft Operations Building. Above, NASA officials Walt Williams, Merritt Preston, Kurt Debus, Brainerd Holmes, and Wernher von Braun
Maiden launch of the Apollo program- Saturn SA-1 from Cape Canaveral, 27 October 1961
First Saturn Launch
Liftoff of Saturn I. Note the long cable mast falling away on the right
mySuperLamePic_c001b3d7f61bec278243523bf2e79253
Abe Silverstein, NASA’s Director of Space Flight Development, is shown touring a rocket engine facility
1-Launch Complex 34, blockhouse interior
Posted on July 9, 2015
4-SIV-SIVB
3-Saturn 1b-V
2-Cutaways
1- SIV_rocket_stage
Posted on January 28, 2016
1=5s-ii-cut-away
1*9s-ii-exploded-view-sm
1-8s-ii-breakdown-sm
Posted on February 4, 2016
5-Test firing of a Saturn V second stage rocket S-II
6-s-ii-subassemblies
4-S-II_Inboard_1963
3-The S-II stage during stacking operations of Apollo 6 in the VAB
2-S-2 assembly building in Seal Beach, CA
1=7s-ii-cut-away-w-callouts
1=6s-ii-subassemblies-sm
1-Saturn_V_second_stage
Posted on February 11, 2016
6-A crescent Earth, as photographed from Apollo 4
5-apollo4_launch
4-Apollo 4 unmanned mission lifts off from launch pad 39A at the Kennedy Space Center
3-Apollo_4_on_the_night_before_launch,_Kennedy_Space_Center,_Florida,_1967
2-Apollo 4 on launch pad 39
1-apollo 4 mating
Posted on February 18, 2016
6-Apollo5 Launch
5-Apollo_5_on_pad with Saturn 1B
4-Lem inside adapter hoisted
3-Lunar Module 1 being mated to the Spacecraft Lunar Module Adapter in preparation for launch as Apollo 5
2-LM1Delivered to the Cape
1-Apollo 5 Mission Patch
Posted on February 25, 2016
5-Apollo-6-1968-04-04
4-Apollo 6’s interstage falling away
3-Apollo6fireyExhaustPlume
2-Apollo_6_launch
1-The Lunar Module Test Article (LTA-2R) is being moved for mating with the spacecraft Lunar Module Adapter
0-apollo-6-final_0
Posted on April 13, 2016
10-The Apollo 7 Command Module as exhibited at The Frontiers of Flight Museum
9-Barbara Eden, Bob Hope, the Apollo 7 astronauts, and Paul Haney (voice of Mission Control) on The Bob Hope Show (November 6, 1968)
8-Crew after recovery aboard USS Essex
6-The crew is welcomed aboard the USS Essex
5-A crewmember being hoisted into the recovery helicopter
3U-At the end of the nearly 11-day mission, flight controllers Gene Kranz, Glynn Lunney, and Gerald Griffin left to right with cigars celebrate splashdown
2U-View of Florida from Apollo 7
1u-Mission Control watches the first live television beamed by an American spacecraft, as Eisele and Schirra signal, %22Keep Those Cards and Letters Coming in, Folks
