Episodes Tagged with "Grumman"
Posted on April 9, 2015
Shea uses models to demonstrate how the lunar module would dock with the command module
Rocket Comparison
Lunar orbit insertion
Posted on April 16, 2015
REF: 2-903-6 SA-2 LAUNCH AT CAPE. IGNITION OF ROCKET (SATURN 1 VEHICLE)
SA-2 erected on launch pedestal
Wernher_von_Braun_confers_with_Brainerd_Holmes_and_Nicholas_Golovin
Posted on April 30, 2015
Posted on May 7, 2015
General Electric employees monitor activities of a spacecraft test in the automatic-checkout-equipment spacecraft control room in 1965
comparison of spacecraft and launch vehicle configuration
Apollo tracking network in 1966. Radar stations with large antennas for continuous tracking and communications were at Goldstone, California; Madrid, Spain; and Canberra, Australia
Posted on May 14, 2015
Full-scale model of the command module, above- the strake aerodynamic devices may be seen at either side of the spacecraft just above the aft heatshield
Removing LM from S=IVB stage
On 16 November 1963 in Cape Canaveral’s Blockhouse 37, NASA’s new manned space flight chief George Mueller
Communications with the moon as the earth turned. Astronauts on the moon’s surface also could talk to one another
Posted on May 21, 2015
download
The cabin section (or primary structure) of the CM is assembled at North American in 1965
The CM probe would slip into the LM’s dish-shaped drogue, and 12 latches on the docking ring would engage, to lock the spacecraft together, airtight
Full-scale model of the service module, resting on a mockup of a spacecraft-lunar module adapter, with panels off to reveal part of the internal arrangement
Jettison of the launch escape system (right) after successful launch, also pulls away the boost protective cover that protects the windows from flame and soot
On the drawing of the launch escape system at upper right, the canard aerodynamic devices are near the top of the escape tower
Posted on June 11, 2015
6-NASA engineers in 1964 decided that astronauts could stand in the lunar module cabin during the trip to the lunar surface. Note triangular windows
7-Proposed sleeping positions for astronauts on the moon
5-Mockup of lunar module cabin with seats
4-The drawing of the stage indicates positions of components
3-underside of the lunar module descent stage shows fuel tank installation
2-Administrator James Webb examines models of the lunar and command modules in docked position
1-Lunar module generations from 1962 (above left; the vehicle originally proposed by Grumman) to 1969
Posted on June 17, 2015
3-improved lunar module features – ladder, porch, hatch, and rendezvous window
2-he addition of a ladder on a landing gear leg made the task much easier
1- Astronauts found a knotted rope from the lunar module difficult to climb down (or up)
Posted on July 2, 2015
5-Removing the LEM
4-ApolloSpacecraftLMAdapterDiagram
3-Apollo_Spacecraft_diagram
2-Tm-1 mockup of the Lunar Module
1-lm-6-rendezvous-radar-antenna-assy-sm
Posted on July 23, 2015
3- 1230_Lunar_module_LTA-2_R
2-Disher_John_
1-Lunar_Module_diagram
Posted on November 12, 2015
LC34_memorial_benches
LC34plaque2 (1)
KSC_Launch_Complex_34
Apollo1plaque
Apollo_1_Silver-Colored_Fliteline_Medallion_(Flown_on_Apollo_9)
Posted on February 18, 2016
6-Apollo5 Launch
5-Apollo_5_on_pad with Saturn 1B
4-Lem inside adapter hoisted
3-Lunar Module 1 being mated to the Spacecraft Lunar Module Adapter in preparation for launch as Apollo 5
2-LM1Delivered to the Cape
1-Apollo 5 Mission Patch
Posted on February 25, 2016
5-Apollo-6-1968-04-04
4-Apollo 6’s interstage falling away
3-Apollo6fireyExhaustPlume
2-Apollo_6_launch
1-The Lunar Module Test Article (LTA-2R) is being moved for mating with the spacecraft Lunar Module Adapter
0-apollo-6-final_0
Posted on March 23, 2016
3-Cunningham during the Apollo 7 mission
2-Donn_F._Eisele prior to launch of ap17
1- Schirra as the Commander of Apollo 7 crew
Posted on March 30, 2016
3-Apollo 7 Launch
2-Schirra, Eisele, and Cunningham (left to right) practice climbing out of the spacecraft into a life raft, to perfect recovery procedures
1-Saturn 205’s first stage rests on the pedestal at Launch Complex 34 before mating with other stages for launch
Posted on April 6, 2016
Untitled
2u-Distant view of the S-IVB stage
1u-Apollo 7 S-IVB rocket stage in orbit
Posted on April 13, 2016
10-The Apollo 7 Command Module as exhibited at The Frontiers of Flight Museum
9-Barbara Eden, Bob Hope, the Apollo 7 astronauts, and Paul Haney (voice of Mission Control) on The Bob Hope Show (November 6, 1968)
8-Crew after recovery aboard USS Essex
6-The crew is welcomed aboard the USS Essex
5-A crewmember being hoisted into the recovery helicopter
3U-At the end of the nearly 11-day mission, flight controllers Gene Kranz, Glynn Lunney, and Gerald Griffin left to right with cigars celebrate splashdown
2U-View of Florida from Apollo 7
1u-Mission Control watches the first live television beamed by an American spacecraft, as Eisele and Schirra signal, %22Keep Those Cards and Letters Coming in, Folks
Posted on May 19, 2016
IMG_0988
3-GEMueller
1-Samuel_C._Phillips
Posted on May 26, 2016
3-Jim_Lovell_official
2-William_Anders
1-Frank_Borman
Posted on September 14, 2016
lm3-sigs
3
2-mcdivitt-and-schweickart-left-to-right-practice-in-the-lunar-module-simulator-for-the-apollo-9-mission-to-evaluate-the-lm-in-earth-orbit-operations-and-the-apollo-suit-in-the-space-environment
1-spacecraft-docking-devices-the-command-module-probe-and-docking-ring-at-right-the-lunar-module-drogue-at-left
Posted on November 13, 2014
p-1G12Patch
LovelAldrinRecovery
Gemini12Into Sun
gemini_xii_mission
