Episodes Tagged with "Launch Complex 34"
Posted on March 5, 2015
12-Second stage (S-IV)
11-Booster stage (S-I)
10-Proposed C-2
9-C-1 and earlier vehicles
8-Model of blockhouse at Launch Complex 34
7-Vehicles using Titan and Atlas stages
6-Saturn C
5-Saturn B
4-Preliminary concept of Launch Complex 34, Cape Canaveral
3-Early H-1 Engine
2-Thor-Jupiter engine
1-Proposed configuration of a clustered booster
Posted on March 12, 2015
Lifting the first stage from the transporter
Hoisting the stage in vertical attitude
Erecting the upper stages
Early design concepts of C-1 and C-5 versions of the Saturn launch vehicles
16-Unloading Compromise in Florida
15-S-I and S-IV stages aboard the Compromise
14-Booster movement around Wheeler Dam
11-Launch Complex 34
10-Configurations of Saturn flight vehicles
9-Saturn Barge route
7-Six-engine configuration of the S-IV stage
6-Redesigned tail of the Saturn booster
5- The barge Palaemon
3-First horizontal mating of the Saturn vehicle
2-Movement of dummy S-IV stage to checkout
Posted on March 18, 2015
To assemble the large Saturns, NASA needed a plant, preferably one already built. The Michoud facility (above), close to New Orleans, suited the requirements
Saturn_SA1_on_launch_pad
Modules of the Apollo spacecraft were tested in Florida in the Manned Spacecraft Operations Building. Above, NASA officials Walt Williams, Merritt Preston, Kurt Debus, Brainerd Holmes, and Wernher von Braun
Maiden launch of the Apollo program- Saturn SA-1 from Cape Canaveral, 27 October 1961
First Saturn Launch
Liftoff of Saturn I. Note the long cable mast falling away on the right
mySuperLamePic_c001b3d7f61bec278243523bf2e79253
Abe Silverstein, NASA’s Director of Space Flight Development, is shown touring a rocket engine facility
1-Launch Complex 34, blockhouse interior
Posted on August 20, 2015
AS-203_launch
AS-202_launch
AS-201_launch
Apollo-Saturn 201 mission – launch, recovery
Posted on October 29, 2015
CM parts were studied and catalogued in the Pyrotechnics Installation Building at Kennedy Space Center.
The CM wiring harness goes through x-ray inspection.
apollo-1-disassembly
Posted on November 5, 2015
Deputy Administrator Seamans, Administrator Webb, Manned Space Flight Administrator George E. Mueller, and Apollo Program Director Phillips testify before a Senate hearing on the Apollo accident
2-Apollo1Langley
1-Apollo1 Inve
Posted on November 12, 2015
LC34_memorial_benches
LC34plaque2 (1)
KSC_Launch_Complex_34
Apollo1plaque
Apollo_1_Silver-Colored_Fliteline_Medallion_(Flown_on_Apollo_9)
Posted on February 18, 2016
6-Apollo5 Launch
5-Apollo_5_on_pad with Saturn 1B
4-Lem inside adapter hoisted
3-Lunar Module 1 being mated to the Spacecraft Lunar Module Adapter in preparation for launch as Apollo 5
2-LM1Delivered to the Cape
1-Apollo 5 Mission Patch
Posted on February 25, 2016
5-Apollo-6-1968-04-04
4-Apollo 6’s interstage falling away
3-Apollo6fireyExhaustPlume
2-Apollo_6_launch
1-The Lunar Module Test Article (LTA-2R) is being moved for mating with the spacecraft Lunar Module Adapter
0-apollo-6-final_0
